date INES title location
03-11-1993INES 0REACTOR TRIP DUE TO FAST CLOSURE OF MAIN STEAM ISOLATION VALVE (MSIV)KORI-3, South Korea
28-10-1993INES 0REACTOR TRIP DUE TO GENERATOR TRIP CAUSED BY ACTIVATION OF GENERATOR PROTECTION RELAYKORI 1, South Korea
18-10-1993INES 0REACTOR TRIP DUE TO FAST CLOSURE OF MAIN FEED ISOLATION VALVES (MFIV)KORI-3, South Korea
27-12-1993INES 2RADIATION EXPOSURE OF WORKERS AT TOKAI REPROCESSING PLANTTOKAI REPROCESSING PLANT, Japan
16-09-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR HIGH HIGH LEVEL SIGNALYONGGWANG-2, South Korea
10-08-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR HIGH HIGH LEVEL SIGNALYONGGWANG-2, South Korea
09-08-1993INES 0REACTOR SHUTDOWN DUE TO LIGHTNINGYONGGWANG-2, South Korea
02-07-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR LOW LOW LEVEL SIGNALKORI 1, South Korea
27-02-1993INES 1WATER INGRESS IN ION CHAMBER HOUSING OF CHANNEL B & E OF REACTOR REGULATING AND PROTECTIVE SYSTEMNARORA-2, India
16-01-1993INES 0NON TRIPPING OV CHANNEL-E ON HIGH BOILER DIFFERENTIAL TEMPERATURE WHILE DOING TESTINGKALPAKKAM-2, India
17-01-1993INES 0NON-AVAILABILITY OF CHANNEL TEMPERATURE MONITORING (CTM) INSTALLATION-2RAJASTHAN-2, India
31-03-1993INES 3COMPLETE STATION BLACK OUT DUE TO FIRE IN TURBINE BUILDINGNARORA-1, India
17-11-1992INES 2OVEREXPOSURE OF WORKER DUE TO THE MALFUNCTION OF THE INTERLOCK SYSTEMMICROTRON, Viet Nam
18-10-1992INES 0UNSCHEDULED SHUTDOWN DUE TO STEAM LEAKAGE FROM AN OUTLET PIPE OF A HIGH PRESSURE TURBINEFUGEN ATR, Japan
13-10-1992INES 0REACTOR TRIP DURING ROUTINE CHECKING OF GROUND IN 250 V DC CIRCUITKALPAKKAM-1, India
16-10-1992INES 0REACTOR SCRAM ON PRM HIGH FLUXTARAPUR-1, India
17-09-1992INES 1TRITIUM ACTIVITY DISCHARGE TO LAKERAJASTHAN-2, India
16-09-1992INES 1TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEMKALPAKKAM-2, India
21-08-1992INES 1SOIL CONTAMINATION WHILE PUMPING OUT RAIN WATER FROM TAPS-TRAP TRANSFER LINE INSPECTION PITTARAPUR-1, India
02-02-1993INES 2CAPSULE BREAKAGE IN CENTRAL THIMBLETRIGA MARK II, Bangladesh
30-07-1992INES 2FUEL ELEMENT DROPTRIGA MARK II, Bangladesh
01-12-1992INES 3COBALT-60 SOURCE LOSSRADIATION FACILITY, China
03-09-1992INES 1LOSS OF 250V DC CONTROL POWER SUPPLY TO 415 V BKRS CONNECTED WITH CLASS-III BUS L&LXRAJASTHAN-2, India
15-06-1992INES 0REACTOR UNIT NO. 1 SCRAM ON TOTAL LOSS OF POWERTARAPUR-1, India
21-08-1992INES 0FAILURE OF 5231 CB-5 TO CLOSE DURING FAILURE 5231 DG-1 TO START WHEN STATION CLASS IV SUPPLY FAILEDRAJASTHAN-1, India
04-07-1992INES 1INSPECTION HEAD LEFT IN CHANNEL G-09 IN UNIT-2RAJASTHAN-2, India
31-07-1992INES 0UNIT NO. 2 REACTOR SCRAM ON PRM HIGH FLUXTARAPUR-2, India
19-08-1992INES 1STARTUP AUXILIARY TRANSFORMER X03B OUTAGE EXCEEDING SEVEN DAYS LIMITTARAPUR-2, India
19-06-1992INES 0UNIT NO. 1 SCRAM ON PRM CH. 6 & IRM CH. 9 KICKING UP DURING FUNCTIONAL CHECKSTARAPUR-1, India
13-05-1992INES 1UNIT-2 EMERGENCY CONDENSER LOOP A TUBE FAILURETARAPUR-2, India