| date | INES | title | location |
| 29-01-1995 | INES 1 | HUMAN ERROR INITATED REACTOR TRIP | CHERNOBYL-3, Ukraine |
| 11-12-1994 | INES 1 | REACTOR AUTOMATIC SHUTDOWN BY SIGNAL OF NUCLEAR INSTRUMENTATION SYSTEMSYSTEM | ONAGAWA-1, Japan |
| 03-12-1994 | INES 0 | TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLE | YONGGWANG-1, South Korea |
| 20-10-1994 | INES 2 | HEAVY WATER SPILLAGE IN CONTAINMENT | WOLSONG-3, South Korea |
| 04-12-1994 | INES 0 | LEAKAGE IN MANUAL VALVE INTO TECHNICAL SPECIFICATIONS | ALMARAZ-1, Spain |
| 10-12-1994 | INES 2 | SMALL LOCA DUE TO REACTOR COOLANT RELIEF VALVE FAILURE | PICKERING-2, Canada |
| 03-10-1994 | INES 2 | STEAM GENERATOR SAFETY VALVES WERE NOT FUNCTIONING ACCORDING TO SPECIFICATIONS | RINGHALS-2, Sweden |
| 15-06-1994 | INES 1 | UNINTENTIONAL SLOW INSERTION OF ALL CONTROL RODS | FORSMARK-3, Sweden |
| 28-09-1994 | INES 1 | PROTECTION SYSTEM FOR INITIATING BLOW DOWN NOT COMPLETELY REESTABLISHED AFTER REFUELLING OUTAGE | BARSEBECK-1, Sweden |
| 26-08-1994 | INES 1 | MISSING LUBRICATION GREASE TO THE ECC SYSTEM'S CORE SPRAY PUMPS | BARSEBECK-1, Sweden |
| 24-11-1994 | INES 1 | LOSS OF ELECTRICAL SUPPLY OF THE BANK PUMP STATION OF KOZLODUY NPP | KOZLODUY-1, Bulgaria |
| 06-03-1994 | INES 0 | DEPRESSURIZATION OF CONTROL ROD HOUSING DISCOVERED DURING ROUTINE INSPECTION | KOLA-3, Russian Federation |
| 03-11-1994 | INES 0 | INFRINGEMENT OF THE REACTOR PRIMARY CIRCUIT INTEGRITY | IGNALINA-1, Lithuania |
| 25-09-1994 | INES 0 | REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNAL | KORI-2, South Korea |
| 17-10-1994 | INES 1 | THROUGH WALL CRACK OF THE UPPER PART OF THE FUEL CHANEL TRACT NO. 41-13 | CHERNOBYL-3, Ukraine |
| 31-08-1994 | INES 1 | DAMAGE TO A SPENT FUEL ASSEMBLY DURING PREPARATORY OPERATIONS FOR REPROCESSING | MAYAK, RT-1, Russian Federation |
| 04-01-1994 | INES 2 | POWER EXCURSION AT MCMASTER NUCLEAR RESEARCH REACTOR DURING FUEL LOADING | MCMASTER RESEARCH REACTOR, Canada |
| 09-08-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY GENERATOR TRIP | IGNALINA-1, Lithuania |
| 22-08-1994 | INES 0 | ONE CONTROL ROD NOT FULLY INSERTED AFTER SCRAM | RINGHALS-4, Sweden |
| 31-08-1994 | INES 1 | LEAKING ISOLATION VALVES IN THE EMERGENCY CORE COOLING SYSTEM | BARSEBECK-2, Sweden |
| 25-05-1994 | INES 0 | REACTOR SCRAM BY ATWT SIGNAL DURING PERIODIC TEST | GUANGDONG-1, China |
| 02-02-1994 | INES 0 | REACOR SCRAM AND TURBINE TRIP BY RCP BUS LOW VOLTAGE | QINSHAN 1, China |
| 21-08-1994 | INES 0 | REACTOR SHUTDOWN CAUSED BY LEAKAGE THROUGH A JOINT WELD IN THE ECCS PIPEWORK | IGNALINA-1, Lithuania |
| 16-06-1994 | INES 0 | FLOODING IN BASEMENT AND SUB BASEMENT OF TURBINE BUILDING | KAKRAPAR-1, India |
| 11-08-1994 | INES 1 | OVERFLOW OF A SOLUTION IN THE MAPU WORKSHOP (MEDIUM ACTIVITY PLUTONIM WORKSHOP) AT THE UP2-400 PLANT | LA HAGUE, France |
| 11-08-1994 | INES 0 | SLIGHT CONTAMINATION AT THE NUCLAR ELECTRICITY PRODUCTION CENTRE OF DAMPIERRE | DAMPIERRE-1, France |
| 14-07-1994 | INES 0 | AUTOMATIC SHUT DOWN OF THE REACTOR AFTER GENERATOR PROTECTION ACTIVATION | KRSKO, Slovenia |
| 11-07-1994 | INES 1 | MALFUNCTION IN THE SYSTEM OF NEUTRON CONTROL OF REACTOR POWER FOLLOWING THE REPLACEMENT OF A CONTROL ROD SWITCH | IGNALINA-2, Lithuania |
| 29-06-1994 | INES 0 | REACTOR TRIP DUE TO GROUND OF MAIN GENERATOR PROTECTION RELAY | KORI 1, South Korea |
| 23-05-1994 | INES 0 | REACTOR TRIP DUE TO FAILURE OF MAIN FEEDWATER CONTROL VALVE (MFCV) | ULCHIN-2, South Korea |