| date | INES | title | location |
| 20-06-1995 | INES 0 | LEAK FROM LIFTING CHARGING PUMP RELIEF VALVE | H.B. ROBINSON-2, United States of America |
| 10-07-1995 | INES 1 | UNINTENTIONAL RELEASE TO THE SEA OF A MINOR AMOUNT OF SLIGHTLYCONTAMINATED WATER | BARSEBECK-1, Sweden |
| 04-07-1995 | INES 2 | SKIN EXPOSURE IN EXCESS OF DOSE LIMIT | BNFL, Sellafield, United Kingdom |
| 08-05-1995 | INES 1 | INADVERTENT DISCHARGE OF LIQUID RADIOACTIVE WASTE | TARAPUR WASTE IMM. PLANT, India |
| 15-09-1993 | INES 1 | DETERIORATION OF NATURAL CIRCULATION | PAKS-2, Hungary |
| 03-05-1993 | INES 1 | UNCONTROLLED INCREASE OF REACTOR POWER | PAKS-4, Hungary |
| 25-06-1993 | INES 0 | LEVEL DECREASE IN THE EMERGENCY BORON TANK | PAKS-1, Hungary |
| 23-12-1992 | INES 1 | LEVEL DECREASE IN ECCS TANK 20TJ20B001,2 | PAKS-2, Hungary |
| 14-07-1994 | INES 1 | SIMULTANEOUS INOPERABILITY OF TWO HIGH-PRESSURE ECCS PUMPS | PAKS-4, Hungary |
| 03-01-1994 | INES 1 | RENDERING AN EMERGENCY FEEDWATER PUMP AND AN AUXILIARY EMERGENCY FEEDWATER PUMP AVAILABLE FOR A SHORT TIME WITHOUT ADHERANCE TO THE REQUIREMENTS OF THE TECSPECS | PAKS-4, Hungary |
| 20-06-1995 | INES 0 | REACTOR SCRAM DURING INSPECTION OF GROUND CONNECTION | BOHUNICE-4, Slovakia |
| 09-06-1995 | INES 2 | FAILURE OF THE ACCESS CONTROL SYSTEM ON THE LARGE HEAVY ION ACCELERATOR GANIL | GANIL, France |
| 02-06-1995 | INES 1 | TURBINE/REACTOR TRIP CAUSED BY AN ERROR IN THE EH CONTROL SYSTEM OF THE TURBINE GENERATOR | KRSKO, Slovenia |
| 28-05-1995 | INES 1 | ROUTINE SURVEILLANCE REVEALS: STEAM GENERATOR SAFETY VALVES OPEN AT HIGHER PRESSURE THAN SPECIFIED AT THE RINGHALS 2. 3 AND 4 PWRS | RINGHALS-2, Sweden |
| 07-02-1995 | INES 0 | STEAM GENERATOR TUBE LEAK AT MAPS-2 | KALPAKKAM-2, India |
| 14-05-1995 | INES 1 | SPURIOUS OPENING OF REACTOR COOLANT LIQUID RELIEF VALVE | BRUCE-5, Canada |
| 14-02-1995 | INES 1 | DROP TIME OF CONTROL RODS OUT OF CRITERION | GUANGDONG-1, China |
| 27-04-1995 | INES 0 | REACTOR SCRAM DUE TO A REACTOR PROTECTION SPURIOUS SIGNAL | BOHUNICE-2, Slovakia |
| 08-03-1995 | INES 0 | REACTOR TRIP DUE TO ACTUATION OF GROUND FAULT RELAY | YONGGWANG-2, South Korea |
| 25-02-1995 | INES 0 | SAFETY INJECTION DUE TO PRESSURIZER SPRAY VALVE STACK | KORI-2, South Korea |
| 25-03-1995 | [N/A] | GASEOUS RELEASE FROM NEARBY CHEMICAL PLANT | WATERFORD-3, United States of America |
| 31-03-1995 | INES 0 | CRACKS IN PUMP AND VALVE CASINGS | OSKARSHAMN-1, Sweden |
| 09-04-1995 | INES 0 | UNSUCCESSFUL SWITCH OVER FROM 400 KV TO 130 KV | RINGHALS-2, Sweden |
| 30-03-1995 | INES 0 | UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWER | KRSKO, Slovenia |
| 07-10-1994 | INES 1 | NON RETRACTION OF SOUTH FUELLING MACHINE GUIDE SLEEVE FROM CHANNELS S-12 | RAJASTHAN-2, India |
| 25-08-1994 | INES 0 | PROBLEM IN LOWERING FRESH FUEL BUNDLE IN THE REACTOR | DHRUVA, India |
| 12-08-1994 | INES 1 | INADVERTENT LOADING OF FUEL COLUMN DURING ON-POWER REFUELLING OF COOLANT CHANNEL | KALPAKKAM-1, India |
| 23-02-1995 | INES 0 | SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT B | BIBLIS-B, Germany |
| 13-02-1995 | [N/A] | CARBON DIOXIDE RELEASE TO A PLANT VITAL AREA | H.B. ROBINSON-2, United States of America |
| 12-02-1995 | INES 1 | NOT FULLY INSERTED CONTROL RODS | RINGHALS-3, Sweden |