05-01-1996INES 0Reactor trip on adjuster rod cooling flow very lowNARORA-2
27-12-1995INES 0Reactor trip on low PHT pressure due to change in power while reverse fueling of channelNARORA-2
10-11-1995INES 1Non-closure of primary steam isolating valves on auto during total loss of power incidentTARAPUR-1
08-05-1995INES 1INADVERTENT DISCHARGE OF LIQUID RADIOACTIVE WASTETARAPUR WASTE IMM. PLANT
07-02-1995INES 0STEAM GENERATOR TUBE LEAK AT MAPS-2KALPAKKAM-2
07-10-1994INES 1NON RETRACTION OF SOUTH FUELLING MACHINE GUIDE SLEEVE FROM CHANNELS S-12RAJASTHAN-2
25-08-1994INES 0PROBLEM IN LOWERING FRESH FUEL BUNDLE IN THE REACTORDHRUVA
12-08-1994INES 1INADVERTENT LOADING OF FUEL COLUMN DURING ON-POWER REFUELLING OF COOLANT CHANNELKALPAKKAM-1
16-06-1994INES 0FLOODING IN BASEMENT AND SUB BASEMENT OF TURBINE BUILDINGKAKRAPAR-1
12-04-1994INES 1IRRADIATED FUEL ROD REMAINING IN THE FLASK WITHOUT COOLING - HUMAN ERRORCIRUS
18-03-1994INES 1OVEREXPOSURE OF OPERATORS WHILE CHARGING IRRADIATED FUEL BUNDLES INTO THE DISSOLVERTROMBAY PLUTONIUM PLANT
31-03-1993INES 3COMPLETE STATION BLACK OUT DUE TO FIRE IN TURBINE BUILDINGNARORA-1
27-02-1993INES 1WATER INGRESS IN ION CHAMBER HOUSING OF CHANNEL B & E OF REACTOR REGULATING AND PROTECTIVE SYSTEMNARORA-2
17-01-1993INES 0NON-AVAILABILITY OF CHANNEL TEMPERATURE MONITORING (CTM) INSTALLATION-2RAJASTHAN-2
16-01-1993INES 0NON TRIPPING OV CHANNEL-E ON HIGH BOILER DIFFERENTIAL TEMPERATURE WHILE DOING TESTINGKALPAKKAM-2
16-10-1992INES 0REACTOR SCRAM ON PRM HIGH FLUXTARAPUR-1
13-10-1992INES 0REACTOR TRIP DURING ROUTINE CHECKING OF GROUND IN 250 V DC CIRCUITKALPAKKAM-1
17-09-1992INES 1TRITIUM ACTIVITY DISCHARGE TO LAKERAJASTHAN-2
16-09-1992INES 1TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEMKALPAKKAM-2
03-09-1992INES 1LOSS OF 250V DC CONTROL POWER SUPPLY TO 415 V BKRS CONNECTED WITH CLASS-III BUS L&LXRAJASTHAN-2
21-08-1992INES 0FAILURE OF 5231 CB-5 TO CLOSE DURING FAILURE 5231 DG-1 TO START WHEN STATION CLASS IV SUPPLY FAILEDRAJASTHAN-1
21-08-1992INES 1SOIL CONTAMINATION WHILE PUMPING OUT RAIN WATER FROM TAPS-TRAP TRANSFER LINE INSPECTION PITTARAPUR-1
19-08-1992INES 1STARTUP AUXILIARY TRANSFORMER X03B OUTAGE EXCEEDING SEVEN DAYS LIMITTARAPUR-2
31-07-1992INES 0UNIT NO. 2 REACTOR SCRAM ON PRM HIGH FLUXTARAPUR-2
04-07-1992INES 1INSPECTION HEAD LEFT IN CHANNEL G-09 IN UNIT-2RAJASTHAN-2
28-06-1992INES 1TRITIUM ACTIVITY IN PROCESS WATER RETURNRAJASTHAN-2
19-06-1992INES 0UNIT NO. 1 SCRAM ON PRM CH. 6 & IRM CH. 9 KICKING UP DURING FUNCTIONAL CHECKSTARAPUR-1
15-06-1992INES 0REACTOR UNIT NO. 1 SCRAM ON TOTAL LOSS OF POWERTARAPUR-1
15-05-1992INES 1DEUTERIUM EXCURSION IN MODERATOR COVER GASRAJASTHAN-2
13-05-1992INES 1UNIT-2 EMERGENCY CONDENSER LOOP A TUBE FAILURETARAPUR-2