INES type: power-reactor

Legenda & explanation
date INES title location
1993-03-18INES 0REACTOR SHUTDOWN BY THE ACTUATION EMERGENCY PROTECTION CAUSED BY THE LEVEL RAISE IN DRUM SEPARATORUkraineCHERNOBYL-3
1993-03-15INES 0ZION UNIT 2 LOSS OF NSSS CONTROL ROOM ANNUNCIATORSUnited States of AmericaZION-2
1993-03-14INES 1PVNGS 2 STEAM GENERATOR TUBE RUPTUREUnited States of AmericaPALO VERDE-2
1993-03-05INES 1UNITS DERATED TO 60% REACTOR POWER DUE TO SAFETY ANALYSIS CONCERNSCanadaBRUCE-1
1993-03-05INES 1COOLANT RADIOACTIVITY EXCEEDING OPERATING LIMITS DUE TO FUEL ROD FAILUREBrazilANGRA-1
1993-03-03INES 0BLOWN FUSE ON THE INVERTER CAUSED REACTOR TRIPSloveniaKRSKO
1993-03-02INES 0MINOR LEAKAGE IN A 15 MM PIPE TO A PILOT VALVE IN THE PRESSURE RELIEF SYSTEMSwedenRINGHALS-1
1993-02-28INES 0MINOR LEAKAGE IN A 32 MM VALVE BONNET SEALSwedenRINGHALS-1
1993-02-27INES 1WATER INGRESS IN ION CHAMBER HOUSING OF CHANNEL B & E OF REACTOR REGULATING AND PROTECTIVE SYSTEMIndiaNARORA-2
1993-02-25INES 2FEEDWATER PIPE RUPTUREFinlandLOVIISA-2
1993-02-24INES 1CRACKS IN PIPEBENDS (ELBOWS) IN THE RESIDUAL HEAT REMOVAL SYSTEMSwedenOSKARSHAMN-1
1993-02-23INES 1FALL DOWN OF CONNECTOR FRAGMENTS INTO THE REACTOR VESSELSlovakiaBOHUNICE-2
1993-02-15INES 0UNIT SHUTDOWN DUE TO HEAVY WATER LEAK AT A FUELLING MACHINECanadaDARLINGTON-2
1993-02-09INES 0FIRE IN A NON-SAFETY RELATED CABINET IN THE CONTROLLED AREABelgiumTIHANGE-1
1993-02-07[N/A]UNAUTHORIZED INTRUDER INTO PLANT PROTECTED AREA WHILE OPERATING AT 100 PERCENT POWERUnited States of AmericaTHREE MILE ISLAND-1
1993-02-02INES 3UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADORussian FederationKOLA-1
1993-02-02INES 3UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADORussian FederationKOLA-2
1993-02-02INES 1UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADORussian FederationKOLA-3
1993-02-02INES 1UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADORussian FederationKOLA-4
1993-01-23INES 0INSUFFICIENT CONTROL ROD FUNCTION DURING HOT START UP TESTSwedenRINGHALS-1
1993-01-20INES 2SUB-COOLING OF THE REACTOR COOLANT SYSTEM DURING A TESTFrancePALUEL-2
1993-01-17INES 0NON-AVAILABILITY OF CHANNEL TEMPERATURE MONITORING (CTM) INSTALLATION-2IndiaRAJASTHAN-2
1993-01-16INES 0NON TRIPPING OV CHANNEL-E ON HIGH BOILER DIFFERENTIAL TEMPERATURE WHILE DOING TESTINGIndiaKALPAKKAM-2
1993-01-14INES 0WOODEN SLEEPERS STORED AT THE SEPARATING WALL BETWEEN UNITS 3 & 4 CAUGHT FIREUkraineCHERNOBYL-3
1993-01-12INES 0CABLE CATCHING FIRE AT THE CONNECTION POINT FOR PORTABLE UTILIZING EQUIPMENTUkraineCHERNOBYL-3