date INES title location
17-10-1994INES 1THROUGH WALL CRACK OF THE UPPER PART OF THE FUEL CHANEL TRACT NO. 41-13CHERNOBYL-3
29-01-1995INES 1HUMAN ERROR INITATED REACTOR TRIPCHERNOBYL-3
24-04-1996INES 1Radioactive contamination at the Unit N3CHERNOBYL-3
30-04-1996INES 1Exceeding allowed maximum primary coolant temperature during planned outageKHMELNITSKI-1
24-07-1996INES 1On-site radioactive contaminationKHMELNITSKI-1
13-02-1991INES 0REACTOR SHUTDOWN DUE TO EXCESS HYDROGEN CONCENTRATION IN THE GENERATOR STATOR GAS TRAPZAPOROZHE-4
27-03-1991INES 0UNIT SHUTDOWN DUE TO PRIMARY CIRCUIT LEAK IN THE LINE OF CONTROLLED LEAKS FROM THE MAIN ISOLATION VALVE SEALSOUTH UKRAINE-1
01-11-1991INES 0PARTIAL DAMAGE TO POWER AND INSTRUMENTATION CABLES OF TURBINE BUILDING VALVES AND AUXILIARY COMPONENTS AS A RESULT OF IGNITIONCHERNOBYL-1
19-04-1992INES 0POWER UNIT UNLOADING DUE TO THE THIRD MAIN CIRCULATION PUMP (MCP-3) TURNING-OFF AS A RESULT OF FALSE OPERATION OF MAJOR PROTECTION SYSTEMZAPOROZHE-4
12-01-1993INES 0CABLE CATCHING FIRE AT THE CONNECTION POINT FOR PORTABLE UTILIZING EQUIPMENTCHERNOBYL-3
14-01-1993INES 0WOODEN SLEEPERS STORED AT THE SEPARATING WALL BETWEEN UNITS 3 & 4 CAUGHT FIRECHERNOBYL-3
18-03-1993INES 0REACTOR SHUTDOWN BY THE ACTUATION EMERGENCY PROTECTION CAUSED BY THE LEVEL RAISE IN DRUM SEPARATORCHERNOBYL-3
28-06-1993INES 0RADIOACTIVE SPOT AT THE NPP SITEZAPOROZHE-1
08-03-1994INES 0SHUNT TRANSFORMER INFLAMMATION AT THE HIGH-VOLTAGE (750 KW) LINE SWITCHYARDZAPOROZHE-1
27-10-1995INES 0UNIT SHUTDOWN BECAUSE OF THE REFUELING MACHINE'S EQUIPMENT FAILURECHERNOBYL-1
03-12-1995INES 0UNIT COLD SHUT DOWN BECAUSE OF THE FLAW IN PIPELINE OF THE PRIMARY MAIN COOLANT PUMPZAPOROZHE-1
28-06-1996INES 0Radioactive contamination in the reactor hallCHERNOBYL-1
28-11-2014INES 0Event during operation of Zaporizhzhya NPP Unit №3ZAPOROZHYE-3