05-02-1992 | [N/A] | STEAM LEAK AT HIGH PRESSURE TURBINE CAP | KRSKO, Slovenia |
24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 2 HIGH LEVEL | KRSKO, Slovenia |
24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 1 HIGH LEVEL | KRSKO, Slovenia |
10-11-1992 | INES 0 | SHORT CIRCUIT CAUSED TURBINE/REACTOR TRIP | KRSKO, Slovenia |
03-03-1993 | INES 0 | BLOWN FUSE ON THE INVERTER CAUSED REACTOR TRIP | KRSKO, Slovenia |
10-05-1993 | INES 0 | STEAM GENERATOR TUBE LEAK | KRSKO, Slovenia |
26-11-1993 | INES 1 | HUMAN ERROR INITIATED SAFETY INJECTION/REACTOR TRIP | KRSKO, Slovenia |
14-07-1994 | INES 0 | AUTOMATIC SHUT DOWN OF THE REACTOR AFTER GENERATOR PROTECTION ACTIVATION | KRSKO, Slovenia |
30-03-1995 | INES 0 | UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWER | KRSKO, Slovenia |
02-06-1995 | INES 1 | TURBINE/REACTOR TRIP CAUSED BY AN ERROR IN THE EH CONTROL SYSTEM OF THE TURBINE GENERATOR | KRSKO, Slovenia |
25-09-1995 | INES 0 | INADVERTENT CLOSURE OF MSIV GENERATED SI SIGNAL FOLLOWED BY REACTOR TRIP | KRSKO, Slovenia |
13-12-1995 | INES 0 | SMALL RADIOACTIVITY RELEASE | KRSKO, Slovenia |
14-08-1996 | INES 0 | Reactor trip caused by blown fuses | KRSKO, Slovenia |
01-01-1997 | INES 0 | Inadvertent closure of the MSIV caused safety injection and plant trip | KRSKO, Slovenia |
17-05-1997 | INES 0 | Loss of the residual heat removal system during refueling | KRSKO, Slovenia |
31-08-1998 | INES 0 | Reactor trip breaker train B undervoltage card damage | KRSKO, Slovenia |
08-06-1999 | INES 0 | Malfunction of the feedwater control valve caused reactor trip | KRSKO, Slovenia |
27-08-2003 | INES 0 | Unexpected closure of the main steam line isolation valve caused reactor trip | KRSKO, Slovenia |
04-06-2008 | INES 0 | Unidentified leakage from the primary circuit in excess of TS limit | KRSKO, Slovenia |
08-10-2013 | INES 0 | Discovery of damaged fuel rods during core unloading and fuel inspections | KRSKO, Slovenia |
11-11-1996 | INES 0 | Small leak in one steam generator | KOZLODUY-6, Bulgaria |
11-05-1991 | INES 1 | UNPLANNED EXPOSURE OF PERSONNEL DURING REFUELLING | KOZLODUY-5, Bulgaria |
05-01-1992 | INES 0 | NO IMPACT TO SAFETY AFTER IGNITION OF THERMAL INSULATION OF A PIPE IN THE PRIMARY COOLANT SYSTEM | KOZLODUY-5, Bulgaria |
22-09-1992 | INES 1 | SMALL FIRES CAUSED BY SHORT-CIRCUIT | KOZLODUY-5, Bulgaria |
16-05-1996 | INES 1 | Disturbance of forced reactor coolant circulation in cold shutdown condition | KOZLODUY-5, Bulgaria |
01-03-2006 | INES 2 | Inoperability of 22 out of 61 control rods at Kozloduy NPP unit 5 | KOZLODUY-5, Bulgaria |
14-09-1991 | INES 1 | SMALL STEAM LEAK FROM THE MAIN FALNGE OF THE PRIMARY COOLANT PUMP NO. 6 | KOZLODUY-4, Bulgaria |
20-01-2003 | INES 1 | Reactor Protection Actuation and safety injection | KOZLODUY-3, Bulgaria |
29-01-1992 | INES 0 | NO IMPACT ON SAFETY FOLLOWING A FIRE IN THE AUXILIARY BUILING OF UNITS 3 AND 4 | KOZLODUY-3, Bulgaria |
15-05-1996 | INES 1 | Small leak of radioactive water from auxiliary building no. 2 | KOZLODUY-3, Bulgaria |