15-10-1992 | INES 1 | LEAKAGE OF REACTOR CIRCUIT PIPE 76 MM DIAMETER FROM REACTOR CHANNEL 32-24 TO THE DRUM SEPARATOR | IGNALINA-2, Lithuania |
12-11-1992 | INES 1 | UNIT OPERATION WITH ONE REACTOR PROTECTION SYSTEM CHANNEL OUT | SOUTH UKRAINE-2, Ukraine |
13-12-1992 | INES 1 | REACTOR SHUTDOWN BY THE ACTUATION OF THE EMERGENCY PROTECTION SYSTEM FOLLOWED BY NON-COMPLIANCE WITH THE SAFE OPERATING LIMITS ON STEAM GENERATOR COOLDOWN RATE | ROVNO-2, Ukraine |
08-12-1992 | INES 1 | INCORRECT CONNECTION OF CABLES TO RELAYS IN SAFETY SYSTEMS | RINGHALS-2, Sweden |
02-01-1993 | INES 1 | SMALL STEAM LEAK FROM THE MAIN FLANGE OF THE PRIMARY COOLANT PUMP NO. 4 | KOZLODUY-2, Bulgaria |
01-11-1992 | INES 1 | INDICATIONS IN AUSTENITIC PIPING DISCOVERED DURING NON-DESTRUCTIVE TESTING | BRUNSBUETTEL, Germany |
21-08-1992 | INES 1 | SOIL CONTAMINATION WHILE PUMPING OUT RAIN WATER FROM TAPS-TRAP TRANSFER LINE INSPECTION PIT | TARAPUR-1, India |
16-09-1992 | INES 1 | TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEM | KALPAKKAM-2, India |
17-09-1992 | INES 1 | TRITIUM ACTIVITY DISCHARGE TO LAKE | RAJASTHAN-2, India |
05-03-1993 | INES 1 | UNITS DERATED TO 60% REACTOR POWER DUE TO SAFETY ANALYSIS CONCERNS | BRUCE-1, Canada |
24-02-1993 | INES 1 | CRACKS IN PIPEBENDS (ELBOWS) IN THE RESIDUAL HEAT REMOVAL SYSTEM | OSKARSHAMN-1, Sweden |
05-03-1993 | INES 1 | COOLANT RADIOACTIVITY EXCEEDING OPERATING LIMITS DUE TO FUEL ROD FAILURE | ANGRA-1, Brazil |
14-03-1993 | INES 1 | PVNGS 2 STEAM GENERATOR TUBE RUPTURE | PALO VERDE-2, United States of America |
12-02-1993 | INES 1 | PLUTONIUM RECOVERY PLANT, B204 | BNFL, Sellafield, United Kingdom |
27-05-1993 | INES 1 | UNIT SCRAM DUE TO INADVERTENT ACTUATION OF PRESSURIZER PILOT RELIEF VALVE | KOLA-3, Russian Federation |
02-02-1993 | INES 1 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-3, Russian Federation |
02-02-1993 | INES 1 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-4, Russian Federation |
27-02-1993 | INES 1 | WATER INGRESS IN ION CHAMBER HOUSING OF CHANNEL B & E OF REACTOR REGULATING AND PROTECTIVE SYSTEM | NARORA-2, India |
07-10-1993 | INES 1 | RADIOACTIVE CONTAMINATION OF THE UNIT ROOMS DUE TO REACTOR COOLANT LEAK IN THE AUXILIARY SYSTEM | BELOYARSKY-3(BN-600), Russian Federation |
08-02-2021 | INES 1 | Stolen Radioactive Source in Mexico on February 8 at some point of the road between Apaseo el Alto and Salamanca, Guanajuato. | Salamanca, Guanajuato State, Mexico |
26-11-1993 | INES 1 | HUMAN ERROR INITIATED SAFETY INJECTION/REACTOR TRIP | KRSKO, Slovenia |
12-10-1993 | INES 1 | IMPENETRABILITY TEST OF CONTAINMENT NOT APPROVED | BARSEBECK-2, Sweden |
18-01-1994 | INES 1 | CRACK IN CONTROL ROD HOUSING | JOSE CABRERA-1 (ZORITA), Spain |
07-02-1994 | INES 1 | FAILURE OF THE FOAM FIRE-EXTINGUISHING SPRINKLER SYSTEM TO OPERATE FOR 16 HOURS DUE TO FROZEN PIPES | IGNALINA-1, Lithuania |
16-03-1994 | INES 1 | REACTOR SCRAM CAUSED BY THE CABLE FIRE UNDER THE TURBINE HALL PREMISES | KHMELNITSKI-1, Ukraine |
21-12-1993 | INES 1 | TURBINE TRIP DUE TO PRESSURE DROP IN STEAM GENERATOR MAIN COLLECTOR | BOHUNICE-2, Slovakia |
24-02-1994 | INES 1 | DETERIORATION OF THE PRIMARY CIRCUIT INTEGRITY | IGNALINA-2, Lithuania |
09-12-1993 | INES 1 | EXCEEDING OF CL-CONCENTRATION IN PRIMARY CIRCUIT WATER | BOHUNICE-2, Slovakia |
22-04-1993 | INES 1 | INTERVENTION OF AUTOMATIC POWER CONTROL (APC) DUE TO SPURIOUS SIGNAL | BOHUNICE-2, Slovakia |
23-02-1993 | INES 1 | FALL DOWN OF CONNECTOR FRAGMENTS INTO THE REACTOR VESSEL | BOHUNICE-2, Slovakia |