1992-05-09INES 1REACTOR SHUTDOWN BY TECHNICAL SPECIFICATIONS APPLICATION (UNUSUAL EVENT)MexicoLAGUNA VERDE-1
1992-05-05INES 0MODERATOR DUMP TIME RECORDING HIGHER THAN NORMALIndiaKALPAKKAM-1
1992-04-19INES 0POWER UNIT UNLOADING DUE TO THE THIRD MAIN CIRCULATION PUMP (MCP-3) TURNING-OFF AS A RESULT OF FALSE OPERATION OF MAJOR PROTECTION SYSTEMUkraineZAPOROZHE-4
1992-04-19INES 0REACTOR UNIT NO.2 SCRAM ON CONSENSER LOW VACUUMIndiaTARAPUR-2
1992-04-16INES 1DEGRADED WATER CHEMISTRY IN THE PRIMARY CIRCUIT DUE TO CEMENT MORTAR INGRESS INTO THE BORATED WATER STORAGE TANKRussian FederationKOLA-2
1992-04-10INES 0LOSS OF AC POWER DURING REFUELING WITH UNLOADED REACTORSwitzerlandBEZNAU-2
1992-03-31INES 0REACTOR UNIT NO.2 SCRAM ON TOTAL LOSS OF POWERIndiaTARAPUR-2
1992-03-30INES 1DROPPING OF A SPENT FUEL BUNDLE IN INSPECTION BAYIndiaKALPAKKAM-2
1992-03-24INES 2UNIT SHUTDOWN DUE TO DEPRESSURIZATION OF ONE FUEL CHANNELRussian FederationLENINGRAD-3
1992-03-18[N/A]NO IMPACT TO SAFETY FOLLOWING RUPTURE OF A BYPASS FEEDWATER LINEUkraineKHMELNITSKI-1
1992-03-04INES 0UNIT SHUTDOWN DUE TO FIRE IN THE 6 KV SWITCHGEAR ROOMRussian FederationBALAKOVO-3
1992-03-03INES 0LOSS OF POWER SUPPLY TO CLASS IV SYSTEMS AND UNIT OUTAGEIndiaKALPAKKAM-1
1992-02-12INES 0UNIT-2 REACTOR SCRAM DUE TO GRID DISTURBANCESIndiaTARAPUR-2
1992-02-07INES 2TEMPORARY COMPLETE LOSS OF RESIDUAL HEAT REMOVALBrazilANGRA-1
1992-02-05[N/A]STEAM LEAK AT HIGH PRESSURE TURBINE CAPSloveniaKRSKO
1992-01-31INES 2DETECTION OF A DESIGN ERROR INTHE LEVEL INSTRUMENTATION IN THE ANNULUS OUTSIDE THE CONTAINMENT SPHERE (BETWEEN THE SPHERE AND THE CONTAINMENT BUILDING)SpainTRILLO-1
1992-01-29INES 0NO IMPACT ON SAFETY FOLLOWING A FIRE IN THE AUXILIARY BUILING OF UNITS 3 AND 4BulgariaKOZLODUY-3
1992-01-24INES 1HEAVY WATER LEAK FROM RUPTURED HOSEIndiaRAJASTHAN-2
1992-01-22INES 2UNAVAILABILITY OF THE IODINE FILTERING OF REACTOR CONTROL ROOM VENTILATION SYSTEMFranceDAMPIERRE-1
1992-01-18INES 1AN IMPORTANT LOSS OF COMMUNICATIONS IN MAIN CONTROL ROOMMexicoLAGUNA VERDE-1
1992-01-06INES 0PLANNED UNIT SHUTDOWN DUE TO BLOCKADE OF ROADIndiaRAJASTHAN-2
1992-01-05INES 0NO IMPACT TO SAFETY AFTER IGNITION OF THERMAL INSULATION OF A PIPE IN THE PRIMARY COOLANT SYSTEMBulgariaKOZLODUY-5
1991-12-30INES 2UNIT SHUTDOWN AS A RESULT OF SPURIOUS OPERATION OF THE FIRE EXTINGUISHING SYSTEM AND DUE TO FLOODING OF ESFAS PANELSUkraineZAPOROZHE-2
1991-12-19INES 0REACTOR TRIP ON LOW PHT PRESSUREIndiaKALPAKKAM-1
1991-12-12INES 0REACTOR TRIP ON LOW PHT PRESSUREIndiaKALPAKKAM-2