1992-07-24TURBINE/REACTOR TRIP ON SG 1 HIGH LEVELSloveniaKRSKO
1993-03-30TURBINE TRIP ON SG HIGH-HIGH WATER LEVEL FOLLOWED BY REACTOR TRIPChinaQINSHAN 1
1995-12-15TURBINE TRIP AND REACTOR SCRAM DUE TO TO AG WATER LEVEL HIGH-HIGHChinaQINSHAN 1
1994-02-03TURBINE TRIP AND REACTOR POWER DECREASE DUE TO FAILURE OF AUXILIARY TRANSFORMER AT NPP DUKOVANYCzech RepublicDUKOVANY-3
2007-12-15TURBINE TRIP AND MANUAL SCRAM DURING NORMALIZATION OF A HEAT EXCHANGER OF THE MAIN OUTPUT TRANSFORMERArgentinaATUCHA-1
1994-12-03TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLESouth KoreaYONGGWANG-1
1996-01-08SUDDEN OPENING OF SAFETY STEAM VALVES DURING A ROUTINE TEST OF THE ECCS CONTROL LOGIC, WITHOUT ANY SAFETY-RELATED CONSEQUENCESArgentinaEMBALSE
2023-02-14Stolen Moisture and Density Testing GaugeMexicoHermosillo, Sonora.
1990-04-24STICKING OF SHIELD PLUG IN THE FUEL CHANNELPakistanKANUPP
2007-02-16Steam Generator tube leakage at Embalse NPPArgentinaEMBALSE
2007-03-16Steam Generator tube leakage at Atucha N.P.PArgentinaATUCHA-1
1995-02-07STEAM GENERATOR TUBE LEAK AT MAPS-2IndiaKALPAKKAM-2
2000-02-15Steam generator tube leakUnited States of AmericaINDIAN POINT-2
1993-05-10STEAM GENERATOR TUBE LEAKSloveniaKRSKO
1997-11-09Small short-term fire in the switchboard in the NPP DukovanyCzech RepublicDUKOVANY-1
1998-07-28Small short-term fire in the electric rectifier in the NPP DukovanyCzech RepublicDUKOVANY-1
1995-12-13SMALL RADIOACTIVITY RELEASESloveniaKRSKO
1995-02-23SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT BGermanyBIBLIS-B
1996-11-11Small leak in one steam generatorBulgariaKOZLODUY-6
1996-06-30Slight contamination of potable water due to damage in an auxiliary heat exchanger of the main condenser circuitArgentinaEMBALSE
1994-08-11SLIGHT CONTAMINATION AT THE NUCLAR ELECTRICITY PRODUCTION CENTRE OF DAMPIERREFranceDAMPIERRE-1
2002-02-25Shutdown of the plant due to high temperature of the RCP motor bearing.SloveniaKRSKO
2006-12-17Shutdown due to Tritium increase in reactor roomArgentinaATUCHA-1
1994-03-08SHUNT TRANSFORMER INFLAMMATION AT THE HIGH-VOLTAGE (750 KW) LINE SWITCHYARDUkraineZAPOROZHE-1
1992-11-10SHORT CIRCUIT CAUSED TURBINE/REACTOR TRIPSloveniaKRSKO
1995-10-04SALEM UNIT 1 LOSS OF CONTROL ROOM ANNUNCIATORSUnited States of AmericaSALEM-1
1995-02-25SAFETY INJECTION DUE TO PRESSURIZER SPRAY VALVE STACKSouth KoreaKORI-2
1995-07-13SAFETY INJECTION DUE TO MAIN STEAM LINE LOW PRESSURESouth KoreaYONGGWANG-1
2004-12-26Safe shutdown of Kalpakkam-2 reactor due to seawater entry into pump houseIndiaKALPAKKAM-2
1992-06-01REPAIR OF REACTOR PRESSURE VESSEL HEAD PENETRATIONSwedenRINGHALS-2