INES type: power-reactor

Legenda & explanation
date INES title location
1993-03-31INES 3COMPLETE STATION BLACK OUT DUE TO FIRE IN TURBINE BUILDINGIndiaNARORA-1
1996-03-19INES 0Unit trip on no primary circulating pump runningIndiaNARORA-1
2000-11-28INES 0Forced shutdown of Narora Unit-1 due to unavailability of make up waterIndiaNARORA-1
1990-11-08INES 0LE ADJUSTER OPERATIONIndiaKALPAKKAM-2
1990-12-27INES 0LOSS OF RAM-C POSITION INDICATIONIndiaKALPAKKAM-2
1991-02-20INES 0ADJUSTER ROD 24V DC FAILUREIndiaKALPAKKAM-2
1991-03-18INES 0UNIT OUTAGE ON CLASS-IV FAILUREIndiaKALPAKKAM-2
1991-05-03INES 1FAILURE OF FUEL OIL LINE IN RUNNING DG-2IndiaKALPAKKAM-2
1992-03-30INES 1DROPPING OF A SPENT FUEL BUNDLE IN INSPECTION BAYIndiaKALPAKKAM-2
1991-12-12INES 0REACTOR TRIP ON LOW PHT PRESSUREIndiaKALPAKKAM-2
1992-09-16INES 1TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEMIndiaKALPAKKAM-2
1993-01-16INES 0NON TRIPPING OV CHANNEL-E ON HIGH BOILER DIFFERENTIAL TEMPERATURE WHILE DOING TESTINGIndiaKALPAKKAM-2
1995-02-07INES 0STEAM GENERATOR TUBE LEAK AT MAPS-2IndiaKALPAKKAM-2
1999-03-26INES 2Leak from coolant channel K-05 at MAPS-2IndiaKALPAKKAM-2
2004-12-26INES 0Safe shutdown of Kalpakkam-2 reactor due to seawater entry into pump houseIndiaKALPAKKAM-2
1990-09-04INES 0FIRE IN CALANDRIA VAULT DRYER AREAIndiaKALPAKKAM-1
1990-09-23INES 0REACTOR TRIP ON PHT LOW PRESSUREIndiaKALPAKKAM-1
1990-10-23INES 1MG-TRIPPING ON UNDER/OVER FREQUENCY PROTECTIONIndiaKALPAKKAM-1
1991-01-07INES 1SHUT DOWN OF MAPS UNITS 1 AND 2 FOLLOWING INABILITY TO MEET MINIMUM STAFF REQUIREMENTIndiaKALPAKKAM-1
1991-03-07INES 1HEAVY WATER SPILL FROM MODERATOR SYSTEMIndiaKALPAKKAM-1
1991-04-02INES 0NON-AVAILABILITY OF BOTH DGS DURING MODERATOR SHUT DOWNIndiaKALPAKKAM-1
1991-07-26INES 0DEUTERIUM INCREASE IN MODERATOR COVER GAS SYSTEMIndiaKALPAKKAM-1
1992-03-03INES 0LOSS OF POWER SUPPLY TO CLASS IV SYSTEMS AND UNIT OUTAGEIndiaKALPAKKAM-1
1991-12-19INES 0REACTOR TRIP ON LOW PHT PRESSUREIndiaKALPAKKAM-1
1991-11-04INES 1LOSS OF CLASS III SUPPLY DUE TO FAULT IN CLASS III BUS SUPPLY BREAKERIndiaKALPAKKAM-1