INES type: power-reactor

Legenda & explanation
date INES title location
2011-10-19INES 1Leakage of Heavy Water from Feeder PipePakistanKANUPP Unit-1 (K-1)
1990-04-24INES 0STICKING OF SHIELD PLUG IN THE FUEL CHANNELPakistanKANUPP
1996-03-29INES 0Power excursion and subsequent plant tripPakistanKANUPP
1996-06-16INES 0Fire incident in boiler roomPakistanKANUPP
2014-05-04INES 1Exposure to Worker in Excess of Administrative LimitPakistanCHASNUPP-1 (C-1)
2021-01-09INES 0Grid Fluctuations at Chashma Nuclear Power Generating Station Affecting C-1, C-2, C-3 and C-4PakistanChashma Nuclear Power Generating Station
1996-11-21INES 2Operation of unit with insufficient containment functionNetherlandsBORSSELE
2010-10-22INES 1Potential damage in riser pipe at Laguna Verde NPP U2MexicoLAGUNA VERDE-2
2011-01-24INES 0Hydrogen Recombiner functional testing not satisfactoryMexicoLAGUNA VERDE-2
2011-01-19INES 2Reactor trip due to high pressure in the reactor pressure vesselMexicoLAGUNA VERDE-2
2002-07-12INES 2Engineering Safety Feature Inoperative at Laguna Verde NPP-1MexicoLAGUNA VERDE-1
1992-05-09INES 1REACTOR SHUTDOWN BY TECHNICAL SPECIFICATIONS APPLICATION (UNUSUAL EVENT)MexicoLAGUNA VERDE-1
1992-01-18INES 1AN IMPORTANT LOSS OF COMMUNICATIONS IN MAIN CONTROL ROOMMexicoLAGUNA VERDE-1
1992-05-13INES 1RECIRCULATION TRANSIENT WITH A SUDDEN INCREASE IN POWER OVER 100%MexicoLAGUNA VERDE-1
1992-05-28INES 1A NON USUAL EVENT DUE TO THE LIBERATION OF GASES INSIDE THE PLANTMexicoLAGUNA VERDE-1
1992-09-18INES 1LOSS OF INTERNAL POWER DUE TO THE TRIP OF THE MAIN TRANSFORMER (T-1)MexicoLAGUNA VERDE-1
1998-11-21INES 2Fuel assembly drop during refuellingMexicoLAGUNA VERDE-1
2011-01-15INES 0Reactor trip due to failure in the Main GeneratorMexicoLAGUNA VERDE-1
2010-12-02INES 1Non Usual Event declared due to loss of outside power at Laguna Verde NPP U1MexicoLAGUNA VERDE-1
2019-11-16INES 2Potential uncontrolled access to room with radiation greater than 1000 mR / hrMexicoLAGUNA VERDE-1
2019-02-12INES 2Potential uncontrolled access to room with radiation greater than 1000 mR / hrMexicoLAGUNA VERDE-1
2024-01-04INES 0Declaration of Unusual Event (NUP-4.1)MexicoLAGUNA VERDE-1
1991-05-04INES 3PERSONNEL OVEREXPOSURE DURING PRECOMMISSIONING OPERATIONS INVOLVING HOT CELLLithuaniaIGNALINA-2
1992-10-15INES 0LEAKAGE FROM REACTOR CIRCUIT PIPE, DIAMETER 26LithuaniaIGNALINA-2
1992-10-15INES 1LEAKAGE OF REACTOR CIRCUIT PIPE 76 MM DIAMETER FROM REACTOR CHANNEL 32-24 TO THE DRUM SEPARATORLithuaniaIGNALINA-2