1995-08-26INES 1DESIGN DEFICIENCIES IN DIESEL GENERATORS FOUND DURING EXTENDED TESTINGSwedenOSKARSHAMN-1
1995-11-15INES 1DEVIATION FROM TECHNICAL SPECIFICATIONSSwedenRINGHALS-4
1996-01-21INES 1A PART OF THE RESIDUAL HEAT REMOVAL SYSTEM - THE AUXILIARY CONDENSER - TEMPORARILY NOT AVAILABLESwedenOSKARSHAMN-1
1996-03-04INES 1FAILURE OF A CONTAINMENT ISOLATION VALVE AT A PERIODICAL TESTSwedenOSKARSHAMN-1
1996-02-06INES 1LOSS OF OFFSITE POWER AND SAFETY INJECTIONUnited States of AmericaCATAWBA-2
1996-04-15INES 1Penetration of primary coolant and low level contamination of hermetic boxSlovakiaBOHUNICE-4
1996-04-24INES 1Radioactive contamination at the Unit N3UkraineCHERNOBYL-3
1996-04-30INES 1Exceeding allowed maximum primary coolant temperature during planned outageUkraineKHMELNITSKI-1
1996-05-15INES 1Small leak of radioactive water from auxiliary building no. 2BulgariaKOZLODUY-3
1996-04-19INES 1ECI impairment due to check valve failure resulting in forced outage of Pickering stationCanadaPICKERING-1
1996-06-12INES 1Degraded pressure subpression (PS) functionSwedenBARSEBECK-2
1996-05-16INES 1Disturbance of forced reactor coolant circulation in cold shutdown conditionBulgariaKOZLODUY-5
1996-07-12INES 1Degradation of essential service water (ES'W) for a year due to a defficient design modificationSpainASCO-1
1996-05-24INES 1Failure to replace horizontal flux detector shielding after maintenanceCanadaPOINT LEPREAU
1996-07-24INES 1On-site radioactive contaminationUkraineKHMELNITSKI-1
1995-11-10INES 1Non-closure of primary steam isolating valves on auto during total loss of power incidentIndiaTARAPUR-1
1996-07-18INES 1Erroneous line-up before start-up of vent pipe valves to the scrubber systemSwedenFORSMARK-1
1996-02-28INES 1Internal Contamination of Several Workers While Cleaning up EquipmentSpainVANDELLOS-1
1997-01-17INES 1Slow insertion of control rodsSpainALMARAZ-2
1996-04-16INES 1Violation of limits and conditions - a late test of emergency core cooling system pumpsCzech RepublicDUKOVANY-2
1996-04-21INES 1Spurious signal for actuation of the ESFAS caused by human errorCzech RepublicDUKOVANY-3
1996-07-08INES 1Violation of limts and conditions - a late test of spray pumpsCzech RepublicDUKOVANY-4
1996-10-06INES 1Scram of the reactor caused by a wrong operation of the control room operatorCzech RepublicDUKOVANY-4
1995-12-08INES 1Secondary sodium leakage in the prototype fast breeder reactor MonjuJapanMONJU