date | INES | title | location  |
11-09-2000 | INES 2 | Finding of abandoned radioactive source in the street | PERU radiation source, Peru |
26-03-1993 | [N/A] | PERRY UNIT 1 MAIN SERVICE WATER PIPE BREAK | PERRY-1, United States of America |
03-02-2009 | INES 2 | Overexposure to Worker | Perma-Fix, United States of America |
05-04-2012 | INES 1 | Fire and abnormal primary circuit leak occured at Penly NPP n°2 reactor | PENLY-2, France |
06-03-2023 | INES 2 | Stress corrosion: presence of a deep crack on the safety injection system of reactor 1 of the Penly NPP | PENLY-1, France |
21-01-2019 | INES 1 | Drop of a source into a logging well | Pécs, Hungary |
11-11-2015 | INES 2 | Overexposure to Radiographer | Pecos, Texas/Nondestructive and Visual Inspection,, United States of America |
15-05-2015 | INES 1 | Eu-152 lightning rods found in metal scrap | PAVOR DOOEL SKOPJE, Scrap Metal Yard Veles, The Former Yugoslav Republic of Macedonia |
22-06-2004 | INES 2 | Non-compliance with regulations during transport of radioactive material | Paul Scherrer Institute; Wuerenlingen,, Switzerland |
06-04-2018 | INES 2 | Worker Overexposure | Pasadena, Texas / Techcorr USA Management LLC, United States of America |
24-03-2012 | INES 2 | Overexposure to Radiographer | Pasadena, Texas / Non-Destructive Inspection Corp, United States of America |
31-10-2004 | INES 2 | Overexposure of Radiographer | Pasadena, United States of America |
17-01-2005 | INES 2 | Radiographer Overexposure | Pasadena, United States of America |
01-08-1991 | INES 2 | DEFECT IN THE COATING OF THE SUMPS (1300 PLANTS) | PALUEL-2, France |
20-01-1993 | INES 2 | SUB-COOLING OF THE REACTOR COOLANT SYSTEM DURING A TEST | PALUEL-2, France |
01-10-1990 | INES 2 | IMPACT ON SAFETY DUE TO PARTIAL INOPERABILITY OF THE LONG TERM COOLING SYSTEM (WATER SUMP FILTERS) | PALUEL-1, France |
07-03-1997 | INES 2 | Exceeding the required operating limits, aggravated by safety culture problems | PALUEL-1, France |
09-11-2017 | INES 2 | Insufficient seismic resistance of emergency diesel generators | PALUEL-1, France |
14-03-1993 | INES 1 | PVNGS 2 STEAM GENERATOR TUBE RUPTURE | PALO VERDE-2, United States of America |
04-04-1996 | INES 0 | Electrical fire in the control room | PALO VERDE-2, United States of America |
30-06-1988 | INES 1 | DEGRADATION OF NATURAL CIRCULATION | PAKS-4, Hungary |
03-01-1994 | INES 1 | RENDERING AN EMERGENCY FEEDWATER PUMP AND AN AUXILIARY EMERGENCY FEEDWATER PUMP AVAILABLE FOR A SHORT TIME WITHOUT ADHERANCE TO THE REQUIREMENTS OF THE TECSPECS | PAKS-4, Hungary |
14-07-1994 | INES 1 | SIMULTANEOUS INOPERABILITY OF TWO HIGH-PRESSURE ECCS PUMPS | PAKS-4, Hungary |
03-05-1993 | INES 1 | UNCONTROLLED INCREASE OF REACTOR POWER | PAKS-4, Hungary |
22-06-2006 | INES 1 | Temperature increase of control rod drive housing 6/7 during restart of Unit 4 | PAKS-4, Hungary |
04-05-2009 | INES 2 | Drop out of a SPND from transport container into the reactor hall during outage | PAKS-4, Hungary |
20-08-1997 | INES 2 | Sticking of one control rod during reactor protection actuation after the turbine control system's test | PAKS-3, Hungary |
22-06-2001 | INES 0 | Fire in the A110/2 cable corridor | PAKS-2, Hungary |
10-04-2003 | INES 3 | Incremented radioactivity of the heat carrier during refueling outage at a time of fuel cleaning | PAKS-2, Hungary |
23-12-1992 | INES 1 | LEVEL DECREASE IN ECCS TANK 20TJ20B001,2 | PAKS-2, Hungary |