date | INES | title | location |
15-12-1993 | INES 0 | REACTOR TRIP DUE TO GROUNDING OF POWER SUPPLY OF CONTROL RODS | YONGGWANG-2, South Korea |
21-12-1993 | INES 0 | REACTOR TRIP DUE TO MAIN CONDENSER VACUUM LOW SIGNAL | KORI-2, South Korea |
27-01-1994 | INES 0 | MANUAL REACTOR SHUTDOWN CAUSED BY THE FAILURE OF THE MANUAL REACTOR CONTROL ROD SYSTEM | IGNALINA-2, Lithuania |
03-02-1994 | INES 0 | TURBINE TRIP AND REACTOR POWER DECREASE DUE TO FAILURE OF AUXILIARY TRANSFORMER AT NPP DUKOVANY | DUKOVANY-3, Czech Republic |
22-02-1994 | INES 0 | LEAKAGE OF FEEDWATER THROUGH WELDED JOINT OF A NB 76 PIPELINE CONNECTING ECCS HEADER WITH DISTRIBUTION GROUP HEADER | LENINGRAD-1, Russian Federation |
08-03-1994 | INES 0 | SHUNT TRANSFORMER INFLAMMATION AT THE HIGH-VOLTAGE (750 KW) LINE SWITCHYARD | ZAPOROZHE-1, Ukraine |
11-01-1994 | INES 0 | REACTOR TRIP DUE TO FAST CLOSURE OF MAIN STEAM ISOLATION VALVE (MSIV) | KORI-4, South Korea |
30-03-1993 | INES 0 | TURBINE TRIP ON SG HIGH-HIGH WATER LEVEL FOLLOWED BY REACTOR TRIP | QINSHAN 1, China |
09-07-1994 | INES 0 | RELEASE OF IODINE 131 FROM THE TURBINE SYSTEM AT RINGHALS 1 | RINGHALS-1, Sweden |
08-07-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY SPURIOUS CLOSING OF THE GATE VALVE AT THE PIPELINE FEEDING THE MAIN CONDENSATE HEATER WITH HEATING STEAM | IGNALINA-2, Lithuania |
23-05-1994 | INES 0 | REACTOR TRIP DUE TO FAILURE OF MAIN FEEDWATER CONTROL VALVE (MFCV) | ULCHIN-2, South Korea |
29-06-1994 | INES 0 | REACTOR TRIP DUE TO GROUND OF MAIN GENERATOR PROTECTION RELAY | KORI 1, South Korea |
14-07-1994 | INES 0 | AUTOMATIC SHUT DOWN OF THE REACTOR AFTER GENERATOR PROTECTION ACTIVATION | KRSKO, Slovenia |
11-08-1994 | INES 0 | SLIGHT CONTAMINATION AT THE NUCLAR ELECTRICITY PRODUCTION CENTRE OF DAMPIERRE | DAMPIERRE-1, France |
16-06-1994 | INES 0 | FLOODING IN BASEMENT AND SUB BASEMENT OF TURBINE BUILDING | KAKRAPAR-1, India |
21-08-1994 | INES 0 | REACTOR SHUTDOWN CAUSED BY LEAKAGE THROUGH A JOINT WELD IN THE ECCS PIPEWORK | IGNALINA-1, Lithuania |
02-02-1994 | INES 0 | REACOR SCRAM AND TURBINE TRIP BY RCP BUS LOW VOLTAGE | QINSHAN 1, China |
25-05-1994 | INES 0 | REACTOR SCRAM BY ATWT SIGNAL DURING PERIODIC TEST | GUANGDONG-1, China |
22-08-1994 | INES 0 | ONE CONTROL ROD NOT FULLY INSERTED AFTER SCRAM | RINGHALS-4, Sweden |
09-08-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY GENERATOR TRIP | IGNALINA-1, Lithuania |
25-09-1994 | INES 0 | REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNAL | KORI-2, South Korea |
03-11-1994 | INES 0 | INFRINGEMENT OF THE REACTOR PRIMARY CIRCUIT INTEGRITY | IGNALINA-1, Lithuania |
06-03-1994 | INES 0 | DEPRESSURIZATION OF CONTROL ROD HOUSING DISCOVERED DURING ROUTINE INSPECTION | KOLA-3, Russian Federation |
04-12-1994 | INES 0 | LEAKAGE IN MANUAL VALVE INTO TECHNICAL SPECIFICATIONS | ALMARAZ-1, Spain |
03-12-1994 | INES 0 | TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLE | YONGGWANG-1, South Korea |
23-02-1995 | INES 0 | SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT B | BIBLIS-B, Germany |
25-08-1994 | INES 0 | PROBLEM IN LOWERING FRESH FUEL BUNDLE IN THE REACTOR | DHRUVA, India |
30-03-1995 | INES 0 | UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWER | KRSKO, Slovenia |
09-04-1995 | INES 0 | UNSUCCESSFUL SWITCH OVER FROM 400 KV TO 130 KV | RINGHALS-2, Sweden |
31-03-1995 | INES 0 | CRACKS IN PUMP AND VALVE CASINGS | OSKARSHAMN-1, Sweden |