date | INES | title | location |
16-11-2019 | INES 2 | Potential uncontrolled access to room with radiation greater than 1000 mR / hr | LAGUNA VERDE-1, Mexico |
12-02-2019 | INES 2 | Potential uncontrolled access to room with radiation greater than 1000 mR / hr | LAGUNA VERDE-1, Mexico |
30-06-2020 | INES 2 | Overexposure to Worker | Alvin, Texas / Ineos Oligomers Chocolate Bayou, United States of America |
03-08-2020 | INES 2 | Overexposure to Worker | Mobile, Alabama / Applied Technical Services, Inc., United States of America |
11-03-2021 | INES 2 | Overexposure to Worker | Livingston, Louisiana / EPIC Piping, LLC, United States of America |
06-10-2021 | INES 2 | Worker Exceeded Annual Whole Body Dose Limit | Pittsburgh, PA / Diamond Technical Services, United States of America |
22-10-2019 | INES 2 | Overexposure to worker due to iridium-192 contamination event | Albuquerque, New Mexico/ Spectratek, United States of America |
14-12-2022 | INES 2 | Worker Exceeded Annual Whole Body Dose Limit | Deer Park, TX / Acuren Inspection Inc., United States of America |
30-09-2022 | INES 2 | Worker Exceeded Annual Whole Body Dose Limit | Waukegan, IL / Vista Medical Center East, United States of America |
09-03-2023 | INES 2 | Stolen Category 2 Source | Houston, TX / Statewide Maintenance Company, United States of America |
26-09-2023 | INES 2 | Worker Exceeded Annual Whole Body Dose Limit | Odessa, TX / Pro Inspection Inc., United States of America |
22-02-2024 | INES 2 | Worker Exceeded Annual Extremity Dose Limit | Alton, IL / Alton Steel, United States of America |
11-12-2023 | INES 2 | Worker Exceeded Annual Dose Limit | Romeoville, Illinois/ SOFIE, United States of America |
24-12-2002 | INES 1 | Start-up Instrumentation Impairment | BRUCE-7, Canada |
19-09-1991 | INES 1 | FUEL BUNDLE DAMAGE DURING TRANSFER TO SPENT FUEL BAY | GENTILLY-2, Canada |
09-05-1992 | INES 1 | REACTOR SHUTDOWN BY TECHNICAL SPECIFICATIONS APPLICATION (UNUSUAL EVENT) | LAGUNA VERDE-1, Mexico |
18-01-1992 | INES 1 | AN IMPORTANT LOSS OF COMMUNICATIONS IN MAIN CONTROL ROOM | LAGUNA VERDE-1, Mexico |
13-05-1992 | INES 1 | RECIRCULATION TRANSIENT WITH A SUDDEN INCREASE IN POWER OVER 100% | LAGUNA VERDE-1, Mexico |
28-05-1992 | INES 1 | A NON USUAL EVENT DUE TO THE LIBERATION OF GASES INSIDE THE PLANT | LAGUNA VERDE-1, Mexico |
18-09-1992 | INES 1 | LOSS OF INTERNAL POWER DUE TO THE TRIP OF THE MAIN TRANSFORMER (T-1) | LAGUNA VERDE-1, Mexico |
05-03-1993 | INES 1 | UNITS DERATED TO 60% REACTOR POWER DUE TO SAFETY ANALYSIS CONCERNS | BRUCE-1, Canada |
14-03-1993 | INES 1 | PVNGS 2 STEAM GENERATOR TUBE RUPTURE | PALO VERDE-2, United States of America |
08-02-2021 | INES 1 | Stolen Radioactive Source in Mexico on February 8 at some point of the road between Apaseo el Alto and Salamanca, Guanajuato. | Salamanca, Guanajuato State, Mexico |
07-04-1994 | INES 1 | PLANT TRANSIENT INITIALLY CAUSED BY THE LOSS OF CIRCULATING WATER PUMPS DUE TO HIGH MARSH GRASS/DEBRIS CONCENTRATIONS | SALEM-1, United States of America |
14-05-1995 | INES 1 | SPURIOUS OPENING OF REACTOR COOLANT LIQUID RELIEF VALVE | BRUCE-5, Canada |
31-10-1995 | INES 1 | HIGH RADIATION LEVELS IN REACTOR BUILDING | LASALLE-1, United States of America |
06-02-1996 | INES 1 | LOSS OF OFFSITE POWER AND SAFETY INJECTION | CATAWBA-2, United States of America |
19-04-1996 | INES 1 | ECI impairment due to check valve failure resulting in forced outage of Pickering station | PICKERING-1, Canada |
24-05-1996 | INES 1 | Failure to replace horizontal flux detector shielding after maintenance | POINT LEPREAU, Canada |
17-01-1997 | INES 1 | Primary heat transport system leakage from coolant channel outlet feeder | POINT LEPREAU, Canada |