15-06-2000 | INES 1 | Unplanned exposure of workers | BOHUNICE-4, Slovakia |
20-10-2004 | INES 1 | Unplanned exposure of workers | Porvoo, Finland |
11-05-1991 | INES 1 | UNPLANNED EXPOSURE OF PERSONNEL DURING REFUELLING | KOZLODUY-5, Bulgaria |
28-03-1991 | INES 0 | UNIT SHUTDOWN DUE TO SHORT CIRCUIT IN THE AUXILIARY POWER TRANSFORMER AND LEAKING OIL FIRE | LENINGRAD-3, Russian Federation |
11-01-1991 | INES 1 | UNIT SHUTDOWN DUE TO SG-4 PULSE LINE RUPTURE | NOVOVORONEZH-5, Russian Federation |
27-03-1991 | INES 0 | UNIT SHUTDOWN DUE TO PRIMARY CIRCUIT LEAK IN THE LINE OF CONTROLLED LEAKS FROM THE MAIN ISOLATION VALVE SEAL | SOUTH UKRAINE-1, Ukraine |
01-06-1991 | INES 1 | UNIT SHUTDOWN DUE TO PERSONNEL ERRORS AND DAMAGE TO RCP 6 KV BREAKER | KALININ-2, Russian Federation |
11-10-1991 | INES 2 | UNIT SHUTDOWN DUE TO FIRE IN THE TURBINE BUILDING CAUSED BY ELECTRICAL EQUIPMENT FAILURE | CHERNOBYL-2, Ukraine |
04-03-1992 | INES 0 | UNIT SHUTDOWN DUE TO FIRE IN THE 6 KV SWITCHGEAR ROOM | BALAKOVO-3, Russian Federation |
24-03-1992 | INES 2 | UNIT SHUTDOWN DUE TO DEPRESSURIZATION OF ONE FUEL CHANNEL | LENINGRAD-3, Russian Federation |
21-02-1991 | INES 0 | UNIT SHUTDOWN DUE TO COOLANT LEAK IN RCP AUXILIARY PIPELINE | KURSK-4, Russian Federation |
23-01-1991 | INES 2 | UNIT SHUTDOWN DUE TO BREACH OF NORMAL OPERATION CONDITIONS | ZAPOROZHE-1, Ukraine |
27-10-1995 | INES 0 | UNIT SHUTDOWN BECAUSE OF THE REFUELING MACHINE'S EQUIPMENT FAILURE | CHERNOBYL-1, Ukraine |
30-12-1991 | INES 2 | UNIT SHUTDOWN AS A RESULT OF SPURIOUS OPERATION OF THE FIRE EXTINGUISHING SYSTEM AND DUE TO FLOODING OF ESFAS PANELS | ZAPOROZHE-2, Ukraine |
17-11-1992 | INES 2 | UNIT SCRAM OWING TO LOSS OF DC PANEL POWER | KOLA-1, Russian Federation |
30-03-1995 | INES 0 | UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWER | KRSKO, Slovenia |
12-08-1992 | INES 0 | UNIT SCRAM DUE TO SHORT-TIME DEENERGIZATION OF AUXILIARY POWER BUSES | KOLA-1, Russian Federation |
23-11-1993 | INES 0 | UNIT SCRAM DUE TO OPERATIONAL OCCURRENCE IN RCP COMPONENT COOLING CIRCUIT | KALININ-1, Russian Federation |
27-05-1993 | INES 1 | UNIT SCRAM DUE TO INADVERTENT ACTUATION OF PRESSURIZER PILOT RELIEF VALVE | KOLA-3, Russian Federation |
13-09-1995 | INES 0 | UNIT SCRAM DUE TO BLOWHOLE IN EMERGENCY REACTOR COOLING SYSTEM(ECCS) PIPE | SMOLENSK-1, Russian Federation |
02-02-1993 | INES 3 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-1, Russian Federation |
02-02-1993 | INES 3 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-2, Russian Federation |
02-02-1993 | INES 1 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-3, Russian Federation |
02-02-1993 | INES 1 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-4, Russian Federation |
12-11-1992 | INES 1 | UNIT OPERATION WITH ONE REACTOR PROTECTION SYSTEM CHANNEL OUT | SOUTH UKRAINE-2, Ukraine |
03-12-1995 | INES 0 | UNIT COLD SHUT DOWN BECAUSE OF THE FLAW IN PIPELINE OF THE PRIMARY MAIN COOLANT PUMP | ZAPOROZHE-1, Ukraine |
15-06-1994 | INES 1 | UNINTENTIONAL SLOW INSERTION OF ALL CONTROL RODS | FORSMARK-3, Sweden |
10-07-1995 | INES 1 | UNINTENTIONAL RELEASE TO THE SEA OF A MINOR AMOUNT OF SLIGHTLYCONTAMINATED WATER | BARSEBECK-1, Sweden |
04-06-2008 | INES 0 | Unidentified leakage from the primary circuit in excess of TS limit | KRSKO, Slovenia |
27-08-2003 | INES 0 | Unexpected closure of the main steam line isolation valve caused reactor trip | KRSKO, Slovenia |