date | INES | title | location |
19-02-2013 | INES 2 | Deficiency in the safety evaluation of the primary reactor drain line | High Flux Reactor Petten, Netherlands |
26-10-2013 | INES 2 | Deficiency in the determination of the uranium content of liquid waste tanks | Molybdenum Production Facility / Petten, Netherlands |
17-10-2013 | INES 2 | Deficiency in the determination of the uranium content of liquid waste tanks | Molybdenum Production Facility / Petten, Netherlands |
23-09-1991 | INES 2 | DEFECTS IN BUGEY AND FESSENHEIM POWER PLANT REACTOR VESSEL HEADS | BUGEY-2, France |
22-06-1991 | INES 2 | DEFECTIVE WELDS IN LOW PRESSURE SAFETY INJECTION SYSTEM | BELLEVILLE-2, France |
06-04-1994 | INES 2 | DEFECT OF THE REACTOR PROTECTION SYSTEM LEVEL CONTROLLER OF THE STEAM GENERATOR | SOUTH UKRAINE-1, Ukraine |
25-05-1994 | INES 1 | DEFECT OF MAIN GATE VALVE STUDS | SOUTH UKRAINE-1, Ukraine |
01-08-1991 | INES 2 | DEFECT IN THE COATING OF THE SUMPS (1300 PLANTS) | PALUEL-2, France |
04-01-2024 | INES 0 | Declaration of Unusual Event (NUP-4.1) | LAGUNA VERDE-1, Mexico |
07-03-2019 | INES 2 | Dangerous Co60 sources discovered in scrap metal containers | Port of Rotterdam, Netherlands |
08-02-2022 | INES 3 | Damaged radiation source out of regulatory control | Dąbrowa Górnicza/Mirków, Poland |
07-12-1991 | INES 0 | DAMAGE TO RCP MAIN THRUST BEARING WHILE PREPARING PRIMARY FOR HYDROTEST | KOLA-3, Russian Federation |
31-08-1994 | INES 1 | DAMAGE TO A SPENT FUEL ASSEMBLY DURING PREPARATORY OPERATIONS FOR REPROCESSING | MAYAK, RT-1, Russian Federation |
09-04-2002 | INES 1 | Damage of a type "A" package during transhipment at Roissy airport (France) between Poland and Ukraine | Roissy Charles De Gaulle airport, France |
07-01-1996 | INES 0 | D2O leak from a calandria tube sheet plug | KALPAKKAM-1, India |
07-10-2016 | INES 2 | Cyclotron operated with an open bunker door | University Hospital of Umeå, Sweden |
12-01-2004 | INES 2 | Cs137 shielded radioactive source smelted in metal recycling facility | Acciaierie Beltrame, metal recycling facility, Vicenza, Italy |
19-04-2007 | INES 1 | Cs-137 source found in a scrap container prepared for export | El Khaled Scrapyard / Tripoli, Lebanon |
20-11-1987 | INES 2 | CRITICALITY SHUT DOWN MARGIN MEASUREMENT STARTED WITHOUT HYDRAULIC SCRAM SYSTEM BEING OPERABLE | OSKARSHAMN-3, Sweden |
18-06-1999 | INES 2 | Criticality accident during periodic inspection | SHIKA-1, Japan |
01-01-1995 | INES 0 | CRACKS IN THE REACTOR CORE SHROUD IN THE LID OF THE SHROUD AND IN REACTOR VESSEL INTERNALS | OSKARSHAMN-1, Sweden |
31-03-1995 | INES 0 | CRACKS IN PUMP AND VALVE CASINGS | OSKARSHAMN-1, Sweden |
24-02-1993 | INES 1 | CRACKS IN PIPEBENDS (ELBOWS) IN THE RESIDUAL HEAT REMOVAL SYSTEM | OSKARSHAMN-1, Sweden |
17-08-1992 | INES 0 | CRACKS IN FEED WATER NOZZLES | RINGHALS-1, Sweden |
18-01-1994 | INES 1 | CRACK IN CONTROL ROD HOUSING | JOSE CABRERA-1 (ZORITA), Spain |
25-02-1999 | INES 0 | Core instability occurred during maintenance performed in the switchyard | OSKARSHAMN-2, Sweden |
05-03-1993 | INES 1 | COOLANT RADIOACTIVITY EXCEEDING OPERATING LIMITS DUE TO FUEL ROD FAILURE | ANGRA-1, Brazil |
03-03-1994 | INES 2 | COOLANT LEAK FROM THE AUXILIARY PRIMARY CIRCUIT CLEANUP SYSTEM DURING COOLDOWN OF THE PRIMARY CIRCUIT | KOLA-2, Russian Federation |
04-10-2011 | INES 2 | Contamination of workers during inspection | Belgoprocess, Belgium |
10-07-2001 | INES 2 | Contamination of workers during dismantling of alpha dry glove boxes | NUCLEAR RESEARCH INST., REZ, Czech Republic |