INES type: power-reactor

Legenda & explanation
date INES title location
1992-05-05INES 0MODERATOR DUMP TIME RECORDING HIGHER THAN NORMALIndiaKALPAKKAM-1
1992-10-13INES 0REACTOR TRIP DURING ROUTINE CHECKING OF GROUND IN 250 V DC CIRCUITIndiaKALPAKKAM-1
1994-08-12INES 1INADVERTENT LOADING OF FUEL COLUMN DURING ON-POWER REFUELLING OF COOLANT CHANNELIndiaKALPAKKAM-1
1996-01-07INES 0D2O leak from a calandria tube sheet plugIndiaKALPAKKAM-1
2011-05-30INES 2Over exposure of workers beyond annual regulatory limitIndiaKAKRAPAR-2
1994-06-16INES 0FLOODING IN BASEMENT AND SUB BASEMENT OF TURBINE BUILDINGIndiaKAKRAPAR-1
1997-03-02INES 0Reactor trip on PHT pressure less than 79.6 kg/cm2 for 15 secondsIndiaKAKRAPAR-1
1997-05-18INES 2Actuation of secondary shutdown system (SSS) on slow insertion of more than one rod of primary shutdown system (PSS)IndiaKAKRAPAR-1
2000-01-26INES 0Earthquake in the Indian State of GujaratIndiaKAKRAPAR-1
2004-03-10INES 2Reactor Trip on steam generator differential temperature high due to loss of power supply to Reactor regulating systemIndiaKAKRAPAR-1
2016-03-11INES 2Leak from primary coolant system at Kakrapar Atomic Station-1IndiaKAKRAPAR-1
1994-04-12INES 1IRRADIATED FUEL ROD REMAINING IN THE FLASK WITHOUT COOLING - HUMAN ERRORIndiaCIRUS
1988-06-30INES 1DEGRADATION OF NATURAL CIRCULATIONHungaryPAKS-4
1994-01-03INES 1RENDERING AN EMERGENCY FEEDWATER PUMP AND AN AUXILIARY EMERGENCY FEEDWATER PUMP AVAILABLE FOR A SHORT TIME WITHOUT ADHERANCE TO THE REQUIREMENTS OF THE TECSPECSHungaryPAKS-4
1994-07-14INES 1SIMULTANEOUS INOPERABILITY OF TWO HIGH-PRESSURE ECCS PUMPSHungaryPAKS-4
1993-05-03INES 1UNCONTROLLED INCREASE OF REACTOR POWERHungaryPAKS-4
2006-06-22INES 1Temperature increase of control rod drive housing 6/7 during restart of Unit 4HungaryPAKS-4
2009-05-04INES 2Drop out of a SPND from transport container into the reactor hall during outageHungaryPAKS-4
1997-08-20INES 2Sticking of one control rod during reactor protection actuation after the turbine control system's testHungaryPAKS-3
2001-06-22INES 0Fire in the A110/2 cable corridorHungaryPAKS-2
2003-04-10INES 3Incremented radioactivity of the heat carrier during refueling outage at a time of fuel cleaningHungaryPAKS-2
1992-12-23INES 1LEVEL DECREASE IN ECCS TANK 20TJ20B001,2HungaryPAKS-2
1993-09-15INES 1DETERIORATION OF NATURAL CIRCULATIONHungaryPAKS-2
1995-11-08INES 2Degradation of the control rod system due to sticking of one control rod assemblyHungaryPAKS-2
1991-07-18INES 1REACTOR SCRAM AND COOLDOWN BECAUSE OF LEAKAGE IN A PRIMARY CIRCUIT MEASURING SYSTEMHungaryPAKS-1