INES type: power-reactor

Legenda & explanation
date INES title location
1993-12-21INES 1TURBINE TRIP DUE TO PRESSURE DROP IN STEAM GENERATOR MAIN COLLECTORSlovakiaBOHUNICE-2
1995-12-15INES 0TURBINE TRIP AND REACTOR SCRAM DUE TO TO AG WATER LEVEL HIGH-HIGHChinaQINSHAN 1
1994-02-03INES 0TURBINE TRIP AND REACTOR POWER DECREASE DUE TO FAILURE OF AUXILIARY TRANSFORMER AT NPP DUKOVANYCzech RepublicDUKOVANY-3
2007-12-15INES 0TURBINE TRIP AND MANUAL SCRAM DURING NORMALIZATION OF A HEAT EXCHANGER OF THE MAIN OUTPUT TRANSFORMERArgentinaATUCHA-1
1990-12-06INES 1TURBINE SJAES STEAMING DUE TO PLANT PERSONNEL ERRORRussian FederationSMOLENSK-3
1994-12-03INES 0TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLESouth KoreaYONGGWANG-1
1992-09-16INES 1TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEMIndiaKALPAKKAM-2
1992-06-28INES 1TRITIUM ACTIVITY IN PROCESS WATER RETURNIndiaRAJASTHAN-2
1992-09-17INES 1TRITIUM ACTIVITY DISCHARGE TO LAKEIndiaRAJASTHAN-2
2003-08-14INES 2Total Impairment of the High Pressure Emergency Core Injection System Affecting Five (5) Reactor Units at Pickering NGSCanadaPickering A - B NGS
1999-09-29[N/A]Tornado sighting within protected areaUnited States of AmericaH.B. ROBINSON-2
1994-10-17INES 1THROUGH WALL CRACK OF THE UPPER PART OF THE FUEL CHANEL TRACT NO. 41-13UkraineCHERNOBYL-3
2011-03-11INES 5The core damage by loss of all cooling function due to the big tsunami.JapanFUKUSHIMA-DAIICHI-3
2011-03-11INES 5The core damage by loss of all cooling function due to the big tsunami.JapanFUKUSHIMA-DAIICHI-2
1990-10-04INES 2TG 2 TRIP DUE TO DEENERGIZATION OF 6 & 0.4 KV BUSES AND FAILURE OF TG STANDBY OIL PUMP TO STARTLithuaniaIGNALINA-1
1999-05-25INES 2Temporary Loss of the seawater cooling systemsSwedenBARSEBECK-2
1992-02-07INES 2TEMPORARY COMPLETE LOSS OF RESIDUAL HEAT REMOVALBrazilANGRA-1
1991-06-15INES 2TEMPERATURE TRANSIENT DURING START-UPUnited KingdomBRADWELL UNIT A
2006-06-22INES 1Temperature increase of control rod drive housing 6/7 during restart of Unit 4HungaryPAKS-4
1996-01-08INES 0SUDDEN OPENING OF SAFETY STEAM VALVES DURING A ROUTINE TEST OF THE ECCS CONTROL LOGIC, WITHOUT ANY SAFETY-RELATED CONSEQUENCESArgentinaEMBALSE
2000-11-24INES 2Successive events in operation during reactor restartFranceTRICASTIN-3
1993-01-20INES 2SUB-COOLING OF THE REACTOR COOLANT SYSTEM DURING A TESTFrancePALUEL-2
2023-03-06INES 2Stress corrosion: presence of a deep crack on the safety injection system of reactor 1 of the Penly NPPFrancePENLY-1
1990-04-24INES 0STICKING OF SHIELD PLUG IN THE FUEL CHANNELPakistanKANUPP
1997-08-20INES 2Sticking of one control rod during reactor protection actuation after the turbine control system's testHungaryPAKS-3