INES type: power-reactor

Legenda & explanation
date INES title location
2001-06-22INES 0Fire in the A110/2 cable corridorHungaryPAKS-2
1991-04-12INES 2FIRE IN SWITCHGEAR BUILDINGFinlandOLKILUOTO-2
1991-07-15INES 1FIRE IN LOW LEVEL RADIOACTIVE WASTE STORAGEBulgariaKOZLODUY-1
1991-07-05[N/A]FIRE IN GAS STORAGEBrazilANGRA-1
1997-10-09INES 0Fire in emergency diesel generator exhaustUnited States of AmericaLIMERICK-2
1998-10-08INES 0Fire in emergency diesel generator control panel during testUnited States of AmericaENRICO FERMI-2
1993-12-24INES 0FIRE IN ELECTRIC TRANSFORMERSpainALMARAZ-1
1990-09-04INES 0FIRE IN CALANDRIA VAULT DRYER AREAIndiaKALPAKKAM-1
1993-02-09INES 0FIRE IN A NON-SAFETY RELATED CABINET IN THE CONTROLLED AREABelgiumTIHANGE-1
2000-10-06[N/A]Fire at Dukovany NPPCzech RepublicDUKOVANY-1
2012-04-05INES 1Fire and abnormal primary circuit leak occured at Penly NPP n°2 reactorFrancePENLY-2
1991-04-25INES 0FINGERS INJURY WHILE WORKING ON PRIMARY STEAM ISOLATION VALVEIndiaTARAPUR-2
1990-05-28INES 1FEEDWATER TUBE RUPTURE DUE TO EROSION CORROSIONFinlandLOVIISA-1
1993-02-25INES 2FEEDWATER PIPE RUPTUREFinlandLOVIISA-2
1990-10-01INES 1FAULTY WELD DETECTED ON PRIMARY CIRCUITSwedenOSKARSHAMN-1
2008-05-30INES 1Fast stop of the main circulation pumps and simultaneous loss of their fly wheel systems during reactor scram.FinlandOLKILUOTO-1
2001-05-15INES 0Fan belt catching fire in the auxiliary building without consequencesBelgiumTIHANGE-1
1993-02-23INES 1FALL DOWN OF CONNECTOR FRAGMENTS INTO THE REACTOR VESSELSlovakiaBOHUNICE-2
1996-05-24INES 1Failure to replace horizontal flux detector shielding after maintenanceCanadaPOINT LEPREAU
1994-06-03INES 2FAILURE TO COMPLY WITH TECHNICAL SPECIFICATIONS FOR OPERATION AT REACTOR 4FranceTRICASTIN-4
1991-09-11INES 0FAILURE OF TWO PRESSURIZER SPRAY LINESSwitzerlandBEZNAU-1
1992-07-06INES 1FAILURE OF TWO DIESEL GENERATORS WHILE ROUTINE TESTING DURING UNIT MAINTENANCERussian FederationBALAKOVO-2
2011-03-11INES 2Failure of the reactor component cooling water system and others by tsunamiJapanONAGAWA-2
1989-06-26INES 0FAILURE OF THE MAIN FEEDWATER PUMP DUE TO ABSENCE OF REQUALIFICATION TEST AFTER MAINTENANCEJapanTSURUGA-2
1994-02-07INES 1FAILURE OF THE FOAM FIRE-EXTINGUISHING SPRINKLER SYSTEM TO OPERATE FOR 16 HOURS DUE TO FROZEN PIPESLithuaniaIGNALINA-1