INES type: power-reactor

Legenda & explanation
date INES title location
1995-01-01INES 0CRACKS IN THE REACTOR CORE SHROUD IN THE LID OF THE SHROUD AND IN REACTOR VESSEL INTERNALSSwedenOSKARSHAMN-1
1995-01-01INES 1DESIGN DEFICIENCIES IDENTIFIED IN SEPARATION OF ELECTRICAL SYSTEM, AVOIDANCE OF COMMON CAUSE FAILURES IN THE REACTOR PROTECTION SYSTEM AND OVERPRESSURE RELEASE IN THE AUX BUILD.SwedenOSKARSHAMN-1
1995-01-01INES 2Intake of radioactive material by workerUnited KingdomPFR DOUNREAY
1994-12-11INES 1REACTOR AUTOMATIC SHUTDOWN BY SIGNAL OF NUCLEAR INSTRUMENTATION SYSTEMSYSTEMJapanONAGAWA-1
1994-12-10INES 2SMALL LOCA DUE TO REACTOR COOLANT RELIEF VALVE FAILURECanadaPICKERING-2
1994-12-04INES 0LEAKAGE IN MANUAL VALVE INTO TECHNICAL SPECIFICATIONSSpainALMARAZ-1
1994-12-03INES 0TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLESouth KoreaYONGGWANG-1
1994-11-24INES 1LOSS OF ELECTRICAL SUPPLY OF THE BANK PUMP STATION OF KOZLODUY NPPBulgariaKOZLODUY-1
1994-11-24INES 1LOSS OF OFF-SITE AC POWERBulgariaKOZLODUY-1
1994-11-03INES 0INFRINGEMENT OF THE REACTOR PRIMARY CIRCUIT INTEGRITYLithuaniaIGNALINA-1
1994-10-20INES 2HEAVY WATER SPILLAGE IN CONTAINMENTSouth KoreaWOLSONG-3
1994-10-17INES 1THROUGH WALL CRACK OF THE UPPER PART OF THE FUEL CHANEL TRACT NO. 41-13UkraineCHERNOBYL-3
1994-10-07INES 1NON RETRACTION OF SOUTH FUELLING MACHINE GUIDE SLEEVE FROM CHANNELS S-12IndiaRAJASTHAN-2
1994-10-03INES 2STEAM GENERATOR SAFETY VALVES WERE NOT FUNCTIONING ACCORDING TO SPECIFICATIONSSwedenRINGHALS-2
1994-09-28INES 1PROTECTION SYSTEM FOR INITIATING BLOW DOWN NOT COMPLETELY REESTABLISHED AFTER REFUELLING OUTAGESwedenBARSEBECK-1
1994-09-25INES 0REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNALSouth KoreaKORI-2
1994-08-31INES 1LEAKING ISOLATION VALVES IN THE EMERGENCY CORE COOLING SYSTEMSwedenBARSEBECK-2
1994-08-26INES 1MISSING LUBRICATION GREASE TO THE ECC SYSTEM'S CORE SPRAY PUMPSSwedenBARSEBECK-1
1994-08-22INES 0ONE CONTROL ROD NOT FULLY INSERTED AFTER SCRAMSwedenRINGHALS-4
1994-08-21INES 0REACTOR SHUTDOWN CAUSED BY LEAKAGE THROUGH A JOINT WELD IN THE ECCS PIPEWORKLithuaniaIGNALINA-1
1994-08-12INES 1INADVERTENT LOADING OF FUEL COLUMN DURING ON-POWER REFUELLING OF COOLANT CHANNELIndiaKALPAKKAM-1
1994-08-11INES 0SLIGHT CONTAMINATION AT THE NUCLAR ELECTRICITY PRODUCTION CENTRE OF DAMPIERREFranceDAMPIERRE-1
1994-08-09INES 0AUTOMATIC REACTOR SHUTDOWN CAUSED BY GENERATOR TRIPLithuaniaIGNALINA-1
1994-07-14INES 0AUTOMATIC SHUT DOWN OF THE REACTOR AFTER GENERATOR PROTECTION ACTIVATIONSloveniaKRSKO
1994-07-14INES 1SIMULTANEOUS INOPERABILITY OF TWO HIGH-PRESSURE ECCS PUMPSHungaryPAKS-4