date | INES | title | location |
07-12-2006 | INES 1 | Incidental Exposure during maintenance tasks | non nuclear, Argentina |
03-08-2008 | INES 1 | Incident involving radioactive material at IAEA safeguards laboratory | IAEA Safeguards Seibersdorf Laboratory, Austria |
07-05-2009 | INES 2 | Incident at Irradiation Facility | STERIGENICS - Fleurus, Belgium |
13-04-2014 | Not Applicable | Inappropriate Transfer of Contaminated Water | FUKUSHIMA-DAIICHI, Japan |
08-09-1991 | INES 1 | INADVERTENT STEAM RELEASE INTO THE REACTOR HALL DUE TO STOP OF PUMP IN RESIDUAL HEAT REMOVAL SYSTEM | BARSEBECK-2, Sweden |
02-09-1999 | INES 2 | Inadvertent plutonium shipment from Belgium to United Kingdom | IRMM, Geel, Belgium |
12-08-1994 | INES 1 | INADVERTENT LOADING OF FUEL COLUMN DURING ON-POWER REFUELLING OF COOLANT CHANNEL | KALPAKKAM-1, India |
08-05-1995 | INES 1 | INADVERTENT DISCHARGE OF LIQUID RADIOACTIVE WASTE | TARAPUR WASTE IMM. PLANT, India |
10-07-1991 | INES 2 | INADVERTENT DILUTION OF THE PRIMARY FLUID DURING A COLD SHUTDOWN | BELLEVILLE-2, France |
12-12-2016 | INES 2 | Inadvertent damage of a Se-75 source | Düsseldorf region, Germany |
17-09-2010 | INES 2 | Inadvertent Containment Spray of Reactor Coolant | SHINKORI-1, South Korea |
01-01-1997 | INES 0 | Inadvertent closure of the MSIV caused safety injection and plant trip | KRSKO, Slovenia |
25-09-1995 | INES 0 | INADVERTENT CLOSURE OF MSIV GENERATED SI SIGNAL FOLLOWED BY REACTOR TRIP | KRSKO, Slovenia |
18-03-2011 | INES 2 | Inadequate setting of the auxiliary feedwater turbopump | DOEL-4, Belgium |
04-07-2005 | INES 2 | Inadequate protection relays and related setpoints | TIHANGE-2, Belgium |
05-09-2012 | INES 1 | Inadequate planned repair of the 10UV68S201 quick-acting gate valve despite of the regulations of the Operational Limits and Conditions | PAKS-1, Hungary |
28-11-2002 | INES 1 | Improper performance of radiography | Welding Institute, Ljubljana, Slovenia |
12-10-1993 | INES 1 | IMPENETRABILITY TEST OF CONTAINMENT NOT APPROVED | BARSEBECK-2, Sweden |
01-07-1990 | INES 2 | IMPACT ON SAFETY DUE TO VIOLATION OF OPERATIONAL LIMITS AND CONDITIONS (IMPURITY DUE TO AIR INGRESS) | CREYS-MALVILLE, France |
01-10-1990 | INES 2 | IMPACT ON SAFETY DUE TO PARTIAL INOPERABILITY OF THE LONG TERM COOLING SYSTEM (WATER SUMP FILTERS) | PALUEL-1, France |
22-08-1990 | INES 2 | IMPACT ON SAFETY DUE TO INOPERABILITY OF A SAFETY SYSTEM DESIGNED FOR ACCIDENT MITIGATION (CONTAINMENT SAND FILTERS) | TRICASTIN-1, France |
25-11-2005 | INES 1 | I-192 sealed source stolen | ORAT s.r.l. Company for industrial non destructive analysis, Italy |
24-01-2011 | INES 0 | Hydrogen Recombiner functional testing not satisfactory | LAGUNA VERDE-2, Mexico |
21-05-1993 | [N/A] | HYDROGEN IGNITION ON THE COOLING SYSTEM OF THE TURBOGENERATOR | ZAPOROZHE-5, Ukraine |
26-11-1993 | INES 1 | HUMAN ERROR INITIATED SAFETY INJECTION/REACTOR TRIP | KRSKO, Slovenia |
29-01-1995 | INES 1 | HUMAN ERROR INITATED REACTOR TRIP | CHERNOBYL-3, Ukraine |
10-01-2022 | INES 2 | Higher dose rate in an operating area due to inappropriate positioning of a Co-60 source | Institute of Isotopes Ltd. Budapest, Hungary |
26-10-1990 | INES 0 | HIGH TRITIUM ACTIVITY IN SOLAR EVAPORATION FACILITY | RAJASTHAN-1, India |
02-01-2002 | INES 3 | High radiation levels measured on a package containing Iridium-192 | Studsvik Nuclear AB, Sweden |
31-10-1995 | INES 1 | HIGH RADIATION LEVELS IN REACTOR BUILDING | LASALLE-1, United States of America |