Europe: France

Legenda & explanation
date INES title location
18-08-2015INES 2Irradiation of a worker during scheduled NNP outage at Le BlayaisBLAYAIS-4
11-06-2014INES 2Irradiation of a worker during an intervention using gamma ray projectorWorksite in Pau (Pyrénées Atlantiques département)
15-06-2007INES 2Irradiation incident of a radiation therapistHospital
18-08-2014INES 2Interventional Radiology: exposure of a health professional in excess of the annual dose limitVal de Saône Polyclinic in Mâcon
30-05-2013INES 2Interventional Radiology - Exceeding of the maximum regulatory annual effective doseSaint-Eloi Hospital (Montpellier)
11-02-2020INES 2Internal contamination of a worker in a fuel pellets fabrication workshopMelox - Orano Cycle - Marcoule
09-11-2017INES 2Insufficient seismic resistance of emergency diesel generatorsPALUEL-1
18-08-2017INES 2Insufficient seismic resistance of a part of the canal embankment along the Tricastin NPPTRICASTIN-1
04-03-1991INES 2INOPERABILITY OF VALVES OF SAFETY SYSTEMSGRAVELINES-6
10-07-1991INES 2INADVERTENT DILUTION OF THE PRIMARY FLUID DURING A COLD SHUTDOWNBELLEVILLE-2
01-07-1990INES 2IMPACT ON SAFETY DUE TO VIOLATION OF OPERATIONAL LIMITS AND CONDITIONS (IMPURITY DUE TO AIR INGRESS)CREYS-MALVILLE
01-10-1990INES 2IMPACT ON SAFETY DUE TO PARTIAL INOPERABILITY OF THE LONG TERM COOLING SYSTEM (WATER SUMP FILTERS)PALUEL-1
22-08-1990INES 2IMPACT ON SAFETY DUE TO INOPERABILITY OF A SAFETY SYSTEM DESIGNED FOR ACCIDENT MITIGATION (CONTAINMENT SAND FILTERS)TRICASTIN-1
09-03-2004INES 2Generic anomaly on some power supply boxes of the French pressurised water reactorsAll NPP - generic
16-05-2004INES 1Fire on electric cables in Cattenom-2 NPPCATTENOM-2
05-04-2012INES 1Fire and abnormal primary circuit leak occured at Penly NPP n°2 reactorPENLY-2
03-06-1994INES 2FAILURE TO COMPLY WITH TECHNICAL SPECIFICATIONS FOR OPERATION AT REACTOR 4TRICASTIN-4
09-06-1995INES 2FAILURE OF THE ACCESS CONTROL SYSTEM ON THE LARGE HEAVY ION ACCELERATOR GANILGANIL
06-10-2009INES 2Failure in fissile material accountabilityCADARACHE
29-01-1994INES 2FAILING TO COMPLY WITH THE OPERATING PROCEDURESBUGEY-5
24-08-2021INES 2External contamination of a worker leading to exceeding of the regulatory annual limit for the equivalent dose to the skinCRUAS-2
02-02-2023INES 2External contamination of a worker leading to exceeding of the annual statutory dose limitCATTENOM-3
31-10-2022INES 2Exposure of a worker in excess of the statutory dose limitAperam Stainless Steel France
23-08-2013INES 2Exposure of a worker in excess of statutory annual dose limitsLAMA (CEA Grenoble)
18-04-2014INES 2Exposure of a worker during radiographic inspectionsDCNS site
12-09-2011INES 1Explosion and fire at Centraco CENTRACO waste processing and conditioning plantCENTRACO (Codolet, France)
07-03-1997INES 2Exceeding the required operating limits, aggravated by safety culture problemsPALUEL-1
06-05-2013INES 2Exceeding of the maximum regulatory annual effective dose by a practitioner in interventional radiologyHospital "Institut Mutualiste Montsouris" (Paris)
27-06-2000INES 2Error in operating rules leading to safety injection system unavailabilityDAMPIERRE-1
20-06-2017INES 2Emergency diesel generators auxiliary systems not compliant with seismic requirements on the 1300 MW reactors (8 sites - 20 reactors)BELLEVILLE-1