date | INES | title | location |
11-01-1991 | INES 1 | UNIT SHUTDOWN DUE TO SG-4 PULSE LINE RUPTURE | NOVOVORONEZH-5, Russian Federation |
25-10-1991 | INES 2 | BORATED WATER STORAGE TANK LEVEL REDUCTION TO 180 M3 | NOVOVORONEZH-4, Russian Federation |
23-11-2021 | INES 2 | Exposure of workers in excess of statutory annual dose limits | Norrköping, Sweden |
29-11-2004 | INES 1 | Radioactive orphan source of Eu-152,154 | non-nuclear, Croatia |
21-04-2022 | INES 1 | Rod type source of a level gauge became open | Nitronénművek Co Ltd., Hungary |
19-11-2012 | INES 2 | loss of a package containing medical radioactive fluorine, during a transport operation in Nimes | Nîmes University Hospital, France |
31-01-1996 | INES 1 | Reactor scram followed by the actuation of safety valve in the reactor primary circuit | NIIAR Inst., Dimitrovgrad, Russian Federation |
28-01-2015 | INES 2 | Overexposure of a worker | National Centre for Nuclear Research, Poland |
26-10-2013 | INES 2 | Deficiency in the determination of the uranium content of liquid waste tanks | Molybdenum Production Facility / Petten, Netherlands |
17-10-2013 | INES 2 | Deficiency in the determination of the uranium content of liquid waste tanks | Molybdenum Production Facility / Petten, Netherlands |
26-07-1997 | INES 1 | Slightly increased radioactivity release outside the reactor while preparing for removal of leaky fuel assembly | MIR-M1, RU-0013, Russian Federation |
07-10-2008 | INES 2 | Cobalt-60 contaminated elevator buttons sold abroad by a French company | Metallic products manufacturer, France |
15-05-1997 | INES 2 | Discovery of a Cs-137 radiation source on a scrap yard | METAL FOUNDRY, HETTSTEDT, Germany |
23-03-1999 | INES 2 | Theft of a vehicle containing a GAM80 gamma radiography unit (with 80 Ci source) | Mesnil Amelot, France |
26-07-2004 | INES 2 | Worker injured and contaminated at the French MOX processing plant MELOX | MELOX Fuel process plant, France |
03-03-2009 | INES 2 | Non-respect of a safety-criticality requirement at AREVA NC Melox facility (Marcoule) | MELOX Fuel process plant, France |
11-02-2020 | INES 2 | Internal contamination of a worker in a fuel pellets fabrication workshop | Melox - Orano Cycle - Marcoule, France |
31-08-1994 | INES 1 | DAMAGE TO A SPENT FUEL ASSEMBLY DURING PREPARATORY OPERATIONS FOR REPROCESSING | MAYAK, RT-1, Russian Federation |
24-09-2023 | INES 2 | Worker Exceeded Statuary Annual Whole Body Dose Limits | Machine Factory, Baden-Württemberg, Germany |
09-03-2023 | INES 3 | Worker Exceeded Statuary Annual Whole Body Dose Limits | Lower Saxony / Company for Material Testing, Germany |
25-02-1993 | INES 2 | FEEDWATER PIPE RUPTURE | LOVIISA-2, Finland |
28-05-1990 | INES 1 | FEEDWATER TUBE RUPTURE DUE TO EROSION CORROSION | LOVIISA-1, Finland |
01-01-1990 | INES 1 | FUEL BUNDLE LATTICE SPACING FAILURES | LOVIISA-1, Finland |
17-08-2000 | INES 1 | Water leakages at Loviisa-1 NPP unit from the fuel loading pool on 17 and 18 August 2000 during the annual maintenance outage | LOVIISA-1, Finland |
28-03-1991 | INES 0 | UNIT SHUTDOWN DUE TO SHORT CIRCUIT IN THE AUXILIARY POWER TRANSFORMER AND LEAKING OIL FIRE | LENINGRAD-3, Russian Federation |
24-03-1992 | INES 2 | UNIT SHUTDOWN DUE TO DEPRESSURIZATION OF ONE FUEL CHANNEL | LENINGRAD-3, Russian Federation |
22-02-1994 | INES 0 | LEAKAGE OF FEEDWATER THROUGH WELDED JOINT OF A NB 76 PIPELINE CONNECTING ECCS HEADER WITH DISTRIBUTION GROUP HEADER | LENINGRAD-1, Russian Federation |
04-09-1990 | INES 1 | REACTOR START UP WITH DEGRADED REACTOR SHUT DOWN SYSTEMS | LEIBSTADT, Switzerland |
11-08-1995 | INES 0 | PERSONNEL INJURY IN TURBINE HALL DURING REFUELLING | LEIBSTADT, Switzerland |
28-05-2004 | INES 1 | Violation of Containment ventilation operation mode | LEIBSTADT, Switzerland |