date | INES | title | location |
16-03-1991 | INES 0 | REACTOR SCRAM ON TOTAL LOSS OF OFF-SITE POWER | TARAPUR-1, India |
07-03-1991 | INES 1 | HEAVY WATER SPILL FROM MODERATOR SYSTEM | KALPAKKAM-1, India |
22-02-1991 | INES 0 | LOWERING OF REACTOR WATER LEVEL BELOW CORE SPRAY ACTUATION LEVEL | TARAPUR-1, India |
20-02-1991 | INES 0 | ADJUSTER ROD 24V DC FAILURE | KALPAKKAM-2, India |
07-01-1991 | INES 1 | SHUT DOWN OF MAPS UNITS 1 AND 2 FOLLOWING INABILITY TO MEET MINIMUM STAFF REQUIREMENT | KALPAKKAM-1, India |
27-12-1990 | INES 0 | LOSS OF RAM-C POSITION INDICATION | KALPAKKAM-2, India |
24-11-1990 | INES 0 | REACTOR SCRAM ON TOTAL LOSS OF OFF-SITE AC POWER (CLASS IV). SRUOR-1-90-9. | TARAPUR-1, India |
19-11-1990 | INES 0 | REACTOR SCRAM ON PRM HIGH FLUX SUBSEQUENT TO SPURIOUS ACTUATION OF REACTOR RELIEF VALVES A & B (SRUOR-1-90-8) | TARAPUR-1, India |
08-11-1990 | INES 0 | LE ADJUSTER OPERATION | KALPAKKAM-2, India |
26-10-1990 | INES 0 | HIGH TRITIUM ACTIVITY IN SOLAR EVAPORATION FACILITY | RAJASTHAN-1, India |
23-10-1990 | INES 1 | MG-TRIPPING ON UNDER/OVER FREQUENCY PROTECTION | KALPAKKAM-1, India |
16-10-1990 | INES 1 | DROPPING OF SPENT FUEL BUNDLES OF CHANNEL P-09 IN SOUTH SIDEFUEL TRANSFER CAVITY | RAJASTHAN-1, India |
23-09-1990 | INES 0 | REACTOR TRIP ON PHT LOW PRESSURE | KALPAKKAM-1, India |
04-09-1990 | INES 0 | FIRE IN CALANDRIA VAULT DRYER AREA | KALPAKKAM-1, India |
18-07-1991 | INES 1 | EARTHQUAKE IN CENTRAL EUROPE | KOZLODUY-1, Bulgaria |
15-07-1991 | INES 1 | FIRE IN LOW LEVEL RADIOACTIVE WASTE STORAGE | KOZLODUY-1, Bulgaria |
28-05-1991 | INES 1 | FUEL ASSEMBLY TILTED OVER DURING CORE LOADING | RINGHALS-2, Sweden |
09-05-1991 | INES 2 | ISOLATION OF FUEL OIL TO ESSENTIAL GAS TURBINES | HINKLEY POINT-B UNIT A, United Kingdom |
01-01-1990 | INES 1 | FUEL BUNDLE LATTICE SPACING FAILURES | LOVIISA-1, Finland |
24-05-1991 | INES 2 | UNAVAILABILITY OF REACTOR LEVEL MEASUREMENT | BELLEVILLE-2, France |
22-06-1991 | INES 2 | DEFECTIVE WELDS IN LOW PRESSURE SAFETY INJECTION SYSTEM | BELLEVILLE-2, France |
04-03-1991 | INES 2 | INOPERABILITY OF VALVES OF SAFETY SYSTEMS | GRAVELINES-6, France |
18-09-1990 | INES 2 | SPURIOUS ACTUATION OF 2 MAIN SAFETY VALVES OUT OF TWELVE | IGNALINA-1, Lithuania |
01-06-1991 | INES 1 | UNIT SHUTDOWN DUE TO PERSONNEL ERRORS AND DAMAGE TO RCP 6 KV BREAKER | KALININ-2, Russian Federation |
11-05-1991 | INES 1 | UNPLANNED EXPOSURE OF PERSONNEL DURING REFUELLING | KOZLODUY-5, Bulgaria |
26-02-1991 | INES 3 | INOPERABILITY OF VALVES AT THE DISCHARGE SIDE OF HPSI PUMPS IN THREE TRAINS DUE TO FAILURE TO CONNECT POWER CABLES | KHMELNITSKI-1, Ukraine |
31-05-1991 | INES 2 | INCORRECT CALIBRATION OF SHUTDOWN SYSTEM AND TWO REGIONAL OVERPOWER DETECTORS | POINT LEPREAU, Canada |
31-03-1991 | INES 1 | WRONG POSITIONING OF THE FUEL ASSEMBLY WHILE PERFORMING FUEL ROD CLADDING INTEGRITY TEST | KOLA-2, Russian Federation |
28-03-1991 | INES 0 | UNIT SHUTDOWN DUE TO SHORT CIRCUIT IN THE AUXILIARY POWER TRANSFORMER AND LEAKING OIL FIRE | LENINGRAD-3, Russian Federation |
27-03-1991 | INES 0 | UNIT SHUTDOWN DUE TO PRIMARY CIRCUIT LEAK IN THE LINE OF CONTROLLED LEAKS FROM THE MAIN ISOLATION VALVE SEAL | SOUTH UKRAINE-1, Ukraine |