21-11-1996 | INES 2 | Operation of unit with insufficient containment function | BORSSELE, Netherlands |
01-01-1995 | INES 2 | Intake of radioactive material by worker | PFR DOUNREAY, United Kingdom |
03-02-1997 | INES 2 | Spillage of active liquor | BNFL, Sellafield, United Kingdom |
02-02-1997 | INES 2 | Release of airborne activity into the workplace resulted in a building evacuation | BNFL, Sellafield, United Kingdom |
03-05-1996 | INES 2 | Radioactive contamination of the fertilizer due to Co-60 source failure | SOFERT RACAU FACTORY, Romania |
11-03-1997 | INES 2 | Uncontrolled entry into room under reactor vessel during refuelling outage | KOEBERG-2, South Africa |
04-10-1996 | INES 2 | Emergency water/reheater drains distribution header damage inside the steam generators | POINT LEPREAU, Canada |
07-03-1997 | INES 2 | Exceeding the required operating limits, aggravated by safety culture problems | PALUEL-1, France |
02-05-1997 | INES 2 | Workers receive dose exceeding statutory annual dose limit | KOEBERG-1, South Africa |
14-12-1996 | INES 2 | Leakage on a piping connected to the primary circuit | DAMPIERRE-1, France |
15-05-1997 | INES 2 | Discovery of a Cs-137 radiation source on a scrap yard | METAL FOUNDRY, HETTSTEDT, Germany |
14-07-1997 | INES 2 | Leakage of water in the primary cooling system of AERE Reasearch Centre | TRIGA MARK II, Bangladesh |
20-08-1997 | INES 2 | Sticking of one control rod during reactor protection actuation after the turbine control system's test | PAKS-3, Hungary |
18-05-1997 | INES 2 | Actuation of secondary shutdown system (SSS) on slow insertion of more than one rod of primary shutdown system (PSS) | KAKRAPAR-1, India |
22-08-1997 | INES 2 | Fresh fuel assembly damage during refuelling | SOUTH UKRAINE-2, Ukraine |
27-09-1997 | INES 2 | Closed valves in the containment spray pumps' suction lines during the non-nuclear phase of start-up after refueling | RINGHALS-4, Sweden |
14-03-1998 | INES 2 | Radiation overexposure of personnel while performing refuellig activities | BILIBINO UNIT D, Russian Federation |
07-05-1998 | INES 2 | Loss of ventilation in Dounreay fuel cycle area | DOUNREAY, United Kingdom |
08-05-1998 | INES 2 | Loss of 4 TBq of Mo-99 in B(U) Packaging | SOUTH AFRICAN AE CORP., South Africa |
13-05-1998 | INES 2 | Large leak in the residual heat removal system (RHR) | CIVAUX-1, France |
19-05-1998 | INES 2 | SG blow down pipe rupture at Kozloduy NPP unit 1 during refuelling outage | KOZLODUY-1, Bulgaria |
06-06-1998 | INES 2 | Unavailability of 1 out of 4 main steam safety and relief valve station | UNTERWESER, Germany |
11-06-1998 | INES 2 | Automatic shutdown of the reactor caused by spurious triggering of the containment spray system and jamming of a control cluster in the high position during this shutdown | BELLEVILLE-2, France |
21-04-1998 | INES 2 | Modification to main steam and main feed isolation valves leading to degradation of reactor protection systems | SIZEWELL-A UNIT B, United Kingdom |
04-06-1998 | INES 2 | Reactor discharge due to deterioration of quality of water in the secondary circuit (power reduction) | ARMENIA-2, Armenia |
13-07-1998 | INES 2 | Failure of safety system train during routine testing | ARMENIA-2, Armenia |
02-10-1998 | INES 2 | Switch off of a protection device during periodic inspection | PHEBUS, France |
10-11-1998 | INES 2 | Workers exposure during weld tests | ZAPOROZHE-3, Ukraine |
21-11-1998 | INES 2 | Fuel assembly drop during refuelling | LAGUNA VERDE-1, Mexico |
27-12-1998 | INES 2 | Loss of off-site power supplies at Hunterston B Power Station | HUNTERSTON-B1 UNIT A, United Kingdom |