30-03-1995 | INES 0 | UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWER | KRSKO, Slovenia |
25-03-1995 | [N/A] | GASEOUS RELEASE FROM NEARBY CHEMICAL PLANT | WATERFORD-3, United States of America |
24-03-1995 | INES 2 | CONFIRMED DOSE ABOVE STATUTORY DOSE LIMIT PROBABLY DUE TO A WOUND | BNFL, Sellafield, United Kingdom |
08-03-1995 | INES 0 | REACTOR TRIP DUE TO ACTUATION OF GROUND FAULT RELAY | YONGGWANG-2, South Korea |
25-02-1995 | INES 0 | SAFETY INJECTION DUE TO PRESSURIZER SPRAY VALVE STACK | KORI-2, South Korea |
23-02-1995 | INES 0 | SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT B | BIBLIS-B, Germany |
14-02-1995 | INES 1 | DROP TIME OF CONTROL RODS OUT OF CRITERION | GUANGDONG-1, China |
13-02-1995 | [N/A] | CARBON DIOXIDE RELEASE TO A PLANT VITAL AREA | H.B. ROBINSON-2, United States of America |
12-02-1995 | INES 1 | NOT FULLY INSERTED CONTROL RODS | RINGHALS-3, Sweden |
07-02-1995 | INES 0 | STEAM GENERATOR TUBE LEAK AT MAPS-2 | KALPAKKAM-2, India |
29-01-1995 | INES 1 | HUMAN ERROR INITATED REACTOR TRIP | CHERNOBYL-3, Ukraine |
01-01-1995 | INES 0 | CRACKS IN THE REACTOR CORE SHROUD IN THE LID OF THE SHROUD AND IN REACTOR VESSEL INTERNALS | OSKARSHAMN-1, Sweden |
01-01-1995 | INES 1 | DESIGN DEFICIENCIES IDENTIFIED IN SEPARATION OF ELECTRICAL SYSTEM, AVOIDANCE OF COMMON CAUSE FAILURES IN THE REACTOR PROTECTION SYSTEM AND OVERPRESSURE RELEASE IN THE AUX BUILD. | OSKARSHAMN-1, Sweden |
01-01-1995 | INES 2 | Intake of radioactive material by worker | PFR DOUNREAY, United Kingdom |
11-12-1994 | INES 1 | REACTOR AUTOMATIC SHUTDOWN BY SIGNAL OF NUCLEAR INSTRUMENTATION SYSTEMSYSTEM | ONAGAWA-1, Japan |
10-12-1994 | INES 2 | SMALL LOCA DUE TO REACTOR COOLANT RELIEF VALVE FAILURE | PICKERING-2, Canada |
04-12-1994 | INES 0 | LEAKAGE IN MANUAL VALVE INTO TECHNICAL SPECIFICATIONS | ALMARAZ-1, Spain |
03-12-1994 | INES 0 | TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLE | YONGGWANG-1, South Korea |
24-11-1994 | INES 1 | LOSS OF ELECTRICAL SUPPLY OF THE BANK PUMP STATION OF KOZLODUY NPP | KOZLODUY-1, Bulgaria |
24-11-1994 | INES 1 | LOSS OF OFF-SITE AC POWER | KOZLODUY-1, Bulgaria |
03-11-1994 | INES 0 | INFRINGEMENT OF THE REACTOR PRIMARY CIRCUIT INTEGRITY | IGNALINA-1, Lithuania |
20-10-1994 | INES 2 | HEAVY WATER SPILLAGE IN CONTAINMENT | WOLSONG-3, South Korea |
17-10-1994 | INES 1 | THROUGH WALL CRACK OF THE UPPER PART OF THE FUEL CHANEL TRACT NO. 41-13 | CHERNOBYL-3, Ukraine |
07-10-1994 | INES 1 | NON RETRACTION OF SOUTH FUELLING MACHINE GUIDE SLEEVE FROM CHANNELS S-12 | RAJASTHAN-2, India |
03-10-1994 | INES 2 | STEAM GENERATOR SAFETY VALVES WERE NOT FUNCTIONING ACCORDING TO SPECIFICATIONS | RINGHALS-2, Sweden |
28-09-1994 | INES 1 | PROTECTION SYSTEM FOR INITIATING BLOW DOWN NOT COMPLETELY REESTABLISHED AFTER REFUELLING OUTAGE | BARSEBECK-1, Sweden |
25-09-1994 | INES 0 | REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNAL | KORI-2, South Korea |
31-08-1994 | INES 1 | LEAKING ISOLATION VALVES IN THE EMERGENCY CORE COOLING SYSTEM | BARSEBECK-2, Sweden |
31-08-1994 | INES 1 | DAMAGE TO A SPENT FUEL ASSEMBLY DURING PREPARATORY OPERATIONS FOR REPROCESSING | MAYAK, RT-1, Russian Federation |
26-08-1994 | INES 1 | MISSING LUBRICATION GREASE TO THE ECC SYSTEM'S CORE SPRAY PUMPS | BARSEBECK-1, Sweden |