On October 18, 2012, three workers were overexposed during industrial radiography at Phool Nagar near Lahore. The event took place due to detachment of Ir-192 source (67 Ci) which remained stuck in the Guide Tube. The workers could not notice this and loaded the Gamma Projector and Guide Tube in the vehicle and traveled for almost 30 minutes from work site to office while placing the Guide Tube very close to the leg of one worker (‘worker A’ sitting on rear seat of the vehicle). After reaching the office, ‘worker A’ unloaded the Gamma Projector to place it in storage pit. ‘Worker B’ performed radiation survey and found that the source was still in the Guide Tube. ‘Worker B’ and ‘worker C’ (‘worker C’ was not a designated radiation worker) conducted the recovery operation and brought the source to shielded position.
‘Worker A’ reported headache and vomiting within 24 hours and severe burns appeared on his left leg in about 15 days which later developed into open wounds. ‘Worker A’ is currently under medical treatment.
The event came into the knowledge of Pakistan Nuclear Regulatory Authority (PNRA) by the end of November 2012. The matter was investigated and investigations found certain violations of regulatory requirements and certain steps of safety procedures. PNRA has served work stoppage notice to the company and further actions are under way.
Calculations were made to assess the dose received by the workers. The whole body dose to the ‘worker A’ sitting near to the source in the vehicle is estimated to be 2.02 Sv and for the other two workers sitting at front seats of the vehicle is 0.81 Sv each.
Big batteries and EVs to the rescue again as faults with new nuclear plant cause chaos on Nordic grids The Finnish nuclear power plant Olkiluoto was finally connected to the grid last year, at an estimated cost of €11 billion compared to the original budget of €3 billion. That cost blowout forced its developer, the […]
A vast subsea nuclear graveyard planned to hold Britain’s burgeoning piles of radioactive waste is set to become the biggest, longest-lasting and most expensive infrastructure project ever undertaken in the UK. The project [UK's nuclear waste dump] is now predicted to take more than 150yrs to complete with lifetime costs of £66bn in today’s money...The […]
Last year, the Dutch Province of Limburg started an alliance in which, besides the local government, research institutes, small nuclear reactor (SMR) developers, utilities, industrial customers and funders cooperated. With this "Limburg SMR alliance" Limburg tried to lead the way towards an SMR in Limburg. The preferred site for a first SMR would be Chemelot, […]
From the IPFM: During a visit to the Civaux nuclear power plant on 18 March 2024, France's Minister of the Armed Forces unveiled a plan to use the plant to produce tritium for the French nuclear weapons program. Civaux is a civilian power plant that belongs to and is operated by Electricité de France. According […]
An analysis by the Norwegian NGO Bellona of transborder trade operations with the customs code 840130 (irradiated fuel assemblies or fuel elements) show a more than twofold increase of import to EU countries of fresh nuclear fuel in cash terms – from 280 million Euros in 2022 to 686 million Euros in 2023. In physical […]