On January 13, 2011, the licensee received a dosimetry report which stated that one of their employees received a year-to-date exposure of 55 mSv (5.5 rem) which was above the statutory limit of 50 mSv (5 rem). The overexposure was received in December 2010 during the emergency repair of a cyclotron unit over a period of several days. However, the affected employee’s real-time dosimeter indicated a much lesser exposure, calling into question the measurement indicated on the permanent dosimeter. Massachusetts subsequently performed an onsite inspection in February 2011 and determined that the affected employee did receive an exposure of 55 mSv (5.5 rem). The licensee attributes the overexposure to misinterpretation of existing policy which restricts workers when year-to-date exposures approach limits and over-reliance on real-time dosimeters. The licensee implemented several corrective actions to include application of administrative correction factors to readings of job-specific dosimeters to obtain more conservative real time results; modifying the permanent dosimeter exchange frequency to obtain more current year-to-date exposure totals; and revision to existing policy. The affected employee had been temporarily removed from potentially high exposure operations during the licensee’s investigation, and was re-instated on March 3, 2011.
Location: Massachusetts General Hospital, Boston MA Event date: Thu, 13-01-2011
Everywhere you look, the nuclear industry’s hype machine is in overdrive. Goldman Sachs, Microsoft, and the UK government all tout small modular reactors as the silver bullet for climate change and energy security. Tech billionaires are hiring nuclear veterans. Wall Street is whispering about “round-the-clock power” for artificial intelligence data centers. For those old enough […]
Kernenergie en veiligheid: A wargame sought to test if a major radiological release that would prompt the evacuation of millions of civilians in South Korea could distract key US allies from assisting and rebuffing an all-out military invasion of Taiwan. The short answer was yes. The game originally presumed that China, wanting to keep the […]
Big batteries and EVs to the rescue again as faults with new nuclear plant cause chaos on Nordic grids The Finnish nuclear power plant Olkiluoto was finally connected to the grid last year, at an estimated cost of €11 billion compared to the original budget of €3 billion. That cost blowout forced its developer, the […]
A vast subsea nuclear graveyard planned to hold Britain’s burgeoning piles of radioactive waste is set to become the biggest, longest-lasting and most expensive infrastructure project ever undertaken in the UK. The project [UK's nuclear waste dump] is now predicted to take more than 150yrs to complete with lifetime costs of £66bn in today’s money...The […]
Last year, the Dutch Province of Limburg started an alliance in which, besides the local government, research institutes, small nuclear reactor (SMR) developers, utilities, industrial customers and funders cooperated. With this "Limburg SMR alliance" Limburg tried to lead the way towards an SMR in Limburg. The preferred site for a first SMR would be Chemelot, […]