On 8 March 2002, with the reactor shut down for a refueling outage, the licensee discovered a significant loss of reactor vessel head base material adjacent to a penetration nozzle that was being inspected. The licensee was performing an inspection of control rod drive nozzles in the reactor vessel head as required by the regulator (US NRC). During the repair of one of the nozzles, the licensee noted some deterioration of the base material surrounding the nozzle. The reactor vessel head is composed of a 6.63 inch thick low alloy steel base material with a stainless steel weld cladding applied to the interior surface. After removal of the nozzle and cleaning of the immediate surrounding area, the licensee discovered significant wastage of the carbon steel material adjacent to the nozzle boring with a total approximate size of 4 to 5 inches x 5 to 7 inches. The reactor vessel head material in this area had been reduced to the thickness of the clad layer, ranging in thickness from 0.24 to 0.38 inches.
Location: DAVIS BESSE-1 Event date: Fri, 08-03-2002
Everywhere you look, the nuclear industry’s hype machine is in overdrive. Goldman Sachs, Microsoft, and the UK government all tout small modular reactors as the silver bullet for climate change and energy security. Tech billionaires are hiring nuclear veterans. Wall Street is whispering about “round-the-clock power” for artificial intelligence data centers. For those old enough […]
Kernenergie en veiligheid: A wargame sought to test if a major radiological release that would prompt the evacuation of millions of civilians in South Korea could distract key US allies from assisting and rebuffing an all-out military invasion of Taiwan. The short answer was yes. The game originally presumed that China, wanting to keep the […]
Big batteries and EVs to the rescue again as faults with new nuclear plant cause chaos on Nordic grids The Finnish nuclear power plant Olkiluoto was finally connected to the grid last year, at an estimated cost of €11 billion compared to the original budget of €3 billion. That cost blowout forced its developer, the […]
A vast subsea nuclear graveyard planned to hold Britain’s burgeoning piles of radioactive waste is set to become the biggest, longest-lasting and most expensive infrastructure project ever undertaken in the UK. The project [UK's nuclear waste dump] is now predicted to take more than 150yrs to complete with lifetime costs of £66bn in today’s money...The […]
Last year, the Dutch Province of Limburg started an alliance in which, besides the local government, research institutes, small nuclear reactor (SMR) developers, utilities, industrial customers and funders cooperated. With this "Limburg SMR alliance" Limburg tried to lead the way towards an SMR in Limburg. The preferred site for a first SMR would be Chemelot, […]