In the course of the investigations following the INES 2 event “Boron concentration below specifi-cation in borated water storage tanks of 3 out of 4 ECCS trains” the licensee detected on October 22, 2001, that the plant was started up after the refueling outage on August 10, 2001, with too low levels in all borated water storage tanks. The specified level in the tanks is > 12.6 m. The level indications showed 12.5 m, 10.8 m, 10.6 m and 9.3 m, respectively. Due to the technical specifi-cations the borated water storage tanks must be filled to the specified level if the primary circuit pressure exceeds 10 bars. The plant personnel ignored the related alarms in the control rooms, so that the filling of the tanks was only performed on August 12, 2001, with the reactor at hot stand-by condition (reactor subcritical).
Everywhere you look, the nuclear industry’s hype machine is in overdrive. Goldman Sachs, Microsoft, and the UK government all tout small modular reactors as the silver bullet for climate change and energy security. Tech billionaires are hiring nuclear veterans. Wall Street is whispering about “round-the-clock power” for artificial intelligence data centers. For those old enough […]
Kernenergie en veiligheid: A wargame sought to test if a major radiological release that would prompt the evacuation of millions of civilians in South Korea could distract key US allies from assisting and rebuffing an all-out military invasion of Taiwan. The short answer was yes. The game originally presumed that China, wanting to keep the […]
Big batteries and EVs to the rescue again as faults with new nuclear plant cause chaos on Nordic grids The Finnish nuclear power plant Olkiluoto was finally connected to the grid last year, at an estimated cost of €11 billion compared to the original budget of €3 billion. That cost blowout forced its developer, the […]
A vast subsea nuclear graveyard planned to hold Britain’s burgeoning piles of radioactive waste is set to become the biggest, longest-lasting and most expensive infrastructure project ever undertaken in the UK. The project [UK's nuclear waste dump] is now predicted to take more than 150yrs to complete with lifetime costs of £66bn in today’s money...The […]
Last year, the Dutch Province of Limburg started an alliance in which, besides the local government, research institutes, small nuclear reactor (SMR) developers, utilities, industrial customers and funders cooperated. With this "Limburg SMR alliance" Limburg tried to lead the way towards an SMR in Limburg. The preferred site for a first SMR would be Chemelot, […]