On August 5th, 2016 at 06:39 (EST) a report was received from the Emergency System and therefore to CNSNS (the regulatory body) informing the theft of a Stolen Source at Ciudad Obregon, Sonora, Mexico. The device was a moisture/density gauge with Am241/Be (1.65GBq) and Cs-137 (370 MBq)
On August 6th, 2016 at 19:35 (EST) The Civil Protection Agency from Sonora State, Mexico, received a notification informing that a person inside a vehicle dropped a black bag on the sidewalk near a stop sign, in Colonia Libertad, Ciudad Obregón, Cajeme Municipality. The person indicated that the bag may contain the stolen moisture/density gauge.
The police went to the reported zone and confirmed that the stolen device was inside the bag. Personnel form the Civil Protection Agency from Sonora State confirmed the serial numer of the aforementioned device (S/N M350707988). First responders cordoned an area of 300 m around the device, setting a Command System in coordination with Sonora State Health Ministry.
The device was recovered and the area was re-opened to normal public activities. There was no evidence that the device was tampered, so no contamination was present.
.
Location: Ciudad Obregon, Sonora, Mexico Event date: Fri, 05-08-2016
Everywhere you look, the nuclear industry’s hype machine is in overdrive. Goldman Sachs, Microsoft, and the UK government all tout small modular reactors as the silver bullet for climate change and energy security. Tech billionaires are hiring nuclear veterans. Wall Street is whispering about “round-the-clock power” for artificial intelligence data centers. For those old enough […]
Kernenergie en veiligheid: A wargame sought to test if a major radiological release that would prompt the evacuation of millions of civilians in South Korea could distract key US allies from assisting and rebuffing an all-out military invasion of Taiwan. The short answer was yes. The game originally presumed that China, wanting to keep the […]
Big batteries and EVs to the rescue again as faults with new nuclear plant cause chaos on Nordic grids The Finnish nuclear power plant Olkiluoto was finally connected to the grid last year, at an estimated cost of €11 billion compared to the original budget of €3 billion. That cost blowout forced its developer, the […]
A vast subsea nuclear graveyard planned to hold Britain’s burgeoning piles of radioactive waste is set to become the biggest, longest-lasting and most expensive infrastructure project ever undertaken in the UK. The project [UK's nuclear waste dump] is now predicted to take more than 150yrs to complete with lifetime costs of £66bn in today’s money...The […]
Last year, the Dutch Province of Limburg started an alliance in which, besides the local government, research institutes, small nuclear reactor (SMR) developers, utilities, industrial customers and funders cooperated. With this "Limburg SMR alliance" Limburg tried to lead the way towards an SMR in Limburg. The preferred site for a first SMR would be Chemelot, […]