On 16th March 2015, ASN was informed by the ECW company (Courcelles-les-Lens) that one of their gamma ray projects had been carried on the public highway on 2nd March 2015 in conditions failing to comply with a number of requirements stipulated by the transport approval issued by ASN. Indeed, the device was not in the closed and locked position and was equipped with its site accessories, which prevented it from being fully inserted into its transport casing.
These deviations increased the risk of ejection of the radioactive source (category 2) from its shielding in the event of an accident and could have led to the irradiation of the individuals in the immediate vicinity of the accident site.
Following notification of this event, ASN carried out two reactive inspections in the premises of the ECW agency, on 26th March and 14th April. The numerous deviations noted by the inspectors show a lack of safety culture within the agency. ASN asked ECW to take corrective measures.
Location: St Pol-sur-Mer (59) and Courcelles-les-Lens (62) Event date: Mon, 02-03-2015
Everywhere you look, the nuclear industry’s hype machine is in overdrive. Goldman Sachs, Microsoft, and the UK government all tout small modular reactors as the silver bullet for climate change and energy security. Tech billionaires are hiring nuclear veterans. Wall Street is whispering about “round-the-clock power” for artificial intelligence data centers. For those old enough […]
Kernenergie en veiligheid: A wargame sought to test if a major radiological release that would prompt the evacuation of millions of civilians in South Korea could distract key US allies from assisting and rebuffing an all-out military invasion of Taiwan. The short answer was yes. The game originally presumed that China, wanting to keep the […]
Big batteries and EVs to the rescue again as faults with new nuclear plant cause chaos on Nordic grids The Finnish nuclear power plant Olkiluoto was finally connected to the grid last year, at an estimated cost of €11 billion compared to the original budget of €3 billion. That cost blowout forced its developer, the […]
A vast subsea nuclear graveyard planned to hold Britain’s burgeoning piles of radioactive waste is set to become the biggest, longest-lasting and most expensive infrastructure project ever undertaken in the UK. The project [UK's nuclear waste dump] is now predicted to take more than 150yrs to complete with lifetime costs of £66bn in today’s money...The […]
Last year, the Dutch Province of Limburg started an alliance in which, besides the local government, research institutes, small nuclear reactor (SMR) developers, utilities, industrial customers and funders cooperated. With this "Limburg SMR alliance" Limburg tried to lead the way towards an SMR in Limburg. The preferred site for a first SMR would be Chemelot, […]