INES type: power-reactor

Legenda & explanation
date INES title location
1991-09-23INES 2DEFECTS IN BUGEY AND FESSENHEIM POWER PLANT REACTOR VESSEL HEADSFranceBUGEY-2
1991-10-25INES 2BORATED WATER STORAGE TANK LEVEL REDUCTION TO 180 M3Russian FederationNOVOVORONEZH-4
1991-12-30INES 2UNIT SHUTDOWN AS A RESULT OF SPURIOUS OPERATION OF THE FIRE EXTINGUISHING SYSTEM AND DUE TO FLOODING OF ESFAS PANELSUkraineZAPOROZHE-2
1992-01-22INES 2UNAVAILABILITY OF THE IODINE FILTERING OF REACTOR CONTROL ROOM VENTILATION SYSTEMFranceDAMPIERRE-1
1992-02-07INES 2TEMPORARY COMPLETE LOSS OF RESIDUAL HEAT REMOVALBrazilANGRA-1
1992-03-24INES 2UNIT SHUTDOWN DUE TO DEPRESSURIZATION OF ONE FUEL CHANNELRussian FederationLENINGRAD-3
1992-01-31INES 2DETECTION OF A DESIGN ERROR INTHE LEVEL INSTRUMENTATION IN THE ANNULUS OUTSIDE THE CONTAINMENT SPHERE (BETWEEN THE SPHERE AND THE CONTAINMENT BUILDING)SpainTRILLO-1
1992-07-28INES 2CLOGGED PUMP SUCTION STRAINERS IN THE WET WELL POOLSwedenBARSEBECK-2
1992-08-21INES 2ABNORMAL PRESENCE OF A FILTER ON A DRAINING CIRCUIT OF THE REACTOR CAVITYFranceCATTENOM-1
1992-09-21INES 2REACTOR SHUTDOWN CAUSED BY AN EMERGENCY PROTECTION SYSTEM ACTUATION FOLLOWED BY NON-COMPLIANCE WITH THE SAFETY LIMITSUkraineSOUTH UKRAINE-1
1992-09-01INES 2INCONCLUSIVE QUALIFICATION TEST RESULTS OF ELECTRIC CONNECTORS IN LOCA AND SLB ENVIRONMENTBelgiumDOEL-3
1992-10-11INES 2METALLURGICAL DEFECTS ON THE MAIN STEAM LINES OF A REACTORFranceST. ALBAN-1
1992-11-17INES 2UNIT SCRAM OWING TO LOSS OF DC PANEL POWERRussian FederationKOLA-1
1993-02-25INES 2FEEDWATER PIPE RUPTUREFinlandLOVIISA-2
1997-03-11INES 2Uncontrolled entry into room under reactor vessel during refuelling outageSouth AfricaKOEBERG-2
1996-10-04INES 2Emergency water/reheater drains distribution header damage inside the steam generatorsCanadaPOINT LEPREAU
1997-03-07INES 2Exceeding the required operating limits, aggravated by safety culture problemsFrancePALUEL-1
1997-05-02INES 2Workers receive dose exceeding statutory annual dose limitSouth AfricaKOEBERG-1
1996-12-14INES 2Leakage on a piping connected to the primary circuitFranceDAMPIERRE-1
1997-08-20INES 2Sticking of one control rod during reactor protection actuation after the turbine control system's testHungaryPAKS-3
1997-05-18INES 2Actuation of secondary shutdown system (SSS) on slow insertion of more than one rod of primary shutdown system (PSS)IndiaKAKRAPAR-1
1997-08-22INES 2Fresh fuel assembly damage during refuellingUkraineSOUTH UKRAINE-2
1997-09-27INES 2Closed valves in the containment spray pumps' suction lines during the non-nuclear phase of start-up after refuelingSwedenRINGHALS-4
1998-03-14INES 2Radiation overexposure of personnel while performing refuellig activitiesRussian FederationBILIBINO UNIT D
1998-05-13INES 2Large leak in the residual heat removal system (RHR)FranceCIVAUX-1