date | INES | title ![](/docu/catalogus/pic/arrow_down.png) | location |
25-10-1991 | INES 2 | BORATED WATER STORAGE TANK LEVEL REDUCTION TO 180 M3 | NOVOVORONEZH-4, Russian Federation |
03-03-1993 | INES 0 | BLOWN FUSE ON THE INVERTER CAUSED REACTOR TRIP | KRSKO, Slovenia |
14-09-1996 | INES 0 | Blockage of sea water screen by jellyfish | ULCHIN-2, South Korea |
09-09-2000 | INES 0 | Beloyarsk NPP Unit 3 scram due to events in the operation of the Urals power system | BELOYARSKY-3(BN-600), Russian Federation |
10-05-2019 | INES 2 | Auxiliary feedwater system actuation and manual reactor trip due to careless withdrawal of control rods at Hanbit Unit 1 | HANBIT-1, South Korea |
22-07-2021 | INES 2 | Automatic trip of both reactors following loss of off-site electric supplies | Heysham 1 Power Station, United Kingdom |
22-07-2021 | INES 2 | Automatic trip of both reactors following loss of off-site electric supplies | Heysham 1 Power Station, United Kingdom |
29-09-1992 | INES 0 | AUTOMATIC SHUTDOWN OF UNIT-2 OF FUKUSHIMA DAIICHI NPP | FUKUSHIMA-DAIICHI-2, Japan |
11-06-1998 | INES 2 | Automatic shutdown of the reactor caused by spurious triggering of the containment spray system and jamming of a control cluster in the high position during this shutdown | BELLEVILLE-2, France |
14-07-1994 | INES 0 | AUTOMATIC SHUT DOWN OF THE REACTOR AFTER GENERATOR PROTECTION ACTIVATION | KRSKO, Slovenia |
12-11-1995 | INES 0 | AUTOMATIC REACTOR UNLOADING DUE TO TURBOGENERATOR TRIP BY OPERATOR | IGNALINA-1, Lithuania |
22-11-1995 | INES 1 | AUTOMATIC REACTOR UNLOADING DUE TO SPURIOUS OPENINGS OF VALVES BETWEEN A GROUP OF ECCS PRESSURIZED TANKS AND REACTOR | IGNALINA-2, Lithuania |
08-07-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY SPURIOUS CLOSING OF THE GATE VALVE AT THE PIPELINE FEEDING THE MAIN CONDENSATE HEATER WITH HEATING STEAM | IGNALINA-2, Lithuania |
09-08-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY GENERATOR TRIP | IGNALINA-1, Lithuania |
17-08-1997 | INES 1 | Automatic protection system disconnected during non nuclear heat up after refuelling | RINGHALS-2, Sweden |
05-01-1990 | INES 0 | AUTOMATIC PLANT SHUTDOWN DUE TO AN EARTHQUAKE | KRSKO, Slovenia |
11-07-2003 | INES 2 | Auto-trip of R21, following trip of Main Boiler Feed Pump, subsequent breach of Gas Circulator 22 Inlet Temp. limit | DUNGENESS-B1 UNIT A, United Kingdom |
26-09-2012 | INES 2 | ASN decided to uprate as level 2 on the INES scale an event related to non-compliance with the requirements applicable to labelling, storage and on-site transfer of wet fissile materials | AREVA-FBFC, France |
31-12-2003 | INES 2 | Anomaly on the water recirculation circuits of French pressurised water reactors | All NPP - generic, France |
09-12-2005 | INES 2 | Anomaly on safety pumps of 900 MW reactors | All NPP - generic, France |
18-01-1992 | INES 1 | AN IMPORTANT LOSS OF COMMUNICATIONS IN MAIN CONTROL ROOM | LAGUNA VERDE-1, Mexico |
20-07-1995 | INES 0 | AMMONIA RELEASE FROM NEARBY CHEMICAL PLANT | WATERFORD-3, United States of America |
26-07-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
26-06-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
23-02-2012 | INES 1 | Am-241 source melting | Outokumpu Tornio Works, Finland |
21-09-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
15-09-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
28-11-2020 | INES 1 | Am-241 meltings | Finnish steel factory, Finland |
20-02-1991 | INES 0 | ADJUSTER ROD 24V DC FAILURE | KALPAKKAM-2, India |
18-05-1997 | INES 2 | Actuation of secondary shutdown system (SSS) on slow insertion of more than one rod of primary shutdown system (PSS) | KAKRAPAR-1, India |