Publicatie Laka-bibliotheek:
Modernisation project for Cernavoda-NPP 2. Assessment of the economic justification. Final report. Extract (2001)
| Auteur | PHARE |
| Datum | augustus 2001 |
| Classificatie | 2.29.9.90/01 (ROEMENIË - INSTALLATIES) |
| Voorkant | ![]() |
Uit de publicatie:
Economic analysis Cernavoda NPP-2 1 EXECUTIVE SUMMARY 1.1 Overview The Canadian-built Cernavoda nuclear plant, which produces about 10% of Romania's total electricity has been searching to expand its production with a second power plant - already 50% completed - for which an additional financing of about 700 millions US$ is required. The Romanian government plans that about US$ 300 million would be covered by buyer credits facilitated by the Contractors and the Romanian authorities asked in April1999 for a EURATOM credit of about 350 Millions Euros for the remaining amount required (representing the local portion of the Project). The negotiations concerning this loan have now reached technical details such as nuclear security, environmental aspects, economic justification and a presentation of Cernavoda financial situation. The purpose of this economic study was to validate the EURATOM loan for the completion of the Cernavoda Unit 2 from the economic justification viewpoint. 1.2 Conclusions A "Least cost analysis" performed in 1998 by EDF-Tractebel-SEP proposes the completion of NPP Cernavoda unit 2 as the best economical choice, with finishing in the same time the rehabilitation works in progress (for the projects already decided and for which financial sources were found) and some hydro power plants in advanced erection stages. Other options included in the least cost development solution are new combined cycle units, with or without heat recovery, operated on imported natural gas. Based· on the new electricity and heat demand forecasts, the least cost solutions about the electricity and heat generating capacities in the National Power System until 2010 should not qualitatively differ from the solution established by the EDF- Tractebel-SEP "Least cost development" study. Besides, even if security and environment aspects are not the subjects of this economic study, they represent also convincing points for the completion of the Cernavoda NPP2. Indeed. Cernavoda NPP1 is among the best ten performing nuclear power plants and different measures have been taken into account to improve safety and security for the NPP2 completion. Another important fact is that the Cernavoda nuclear plants rely on the CANDU system, which will enable Romania to be self reliant in the nuclear sector as a CANDU uses natural uranium fuel, which is produced locally.
Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.

