Economic analysis Cernavoda NPP-2

1 EXECUTIVE SUMMARY

1.1 Overview

The Canadian-built Cernavoda nuclear plant, which produces about 10% of 
Romania's total electricity has been searching to expand its production with a 
second power plant - already 50% completed - for which an additional financing 
of about 700 millions US$ is required. The Romanian government plans that about 
US$ 300 million would be covered by buyer credits facilitated by the Contractors 
and the Romanian authorities asked in April1999 for a EURATOM credit of about 
350 Millions Euros for the remaining amount required (representing the local 
portion of the Project).

The negotiations concerning this loan have now reached technical details such as 
nuclear security, environmental aspects, economic justification and a presentation 
of Cernavoda financial situation. The purpose of this economic study was to validate 
the EURATOM loan for the completion of the Cernavoda Unit 2 from the economic 
justification viewpoint.

1.2 Conclusions
A "Least cost analysis" performed in 1998 by EDF-Tractebel-SEP proposes the 
completion of NPP Cernavoda unit 2 as the best economical choice, with finishing in 
the same time the rehabilitation works in progress (for the projects already decided 
and for which financial sources were found) and some hydro power plants in 
advanced erection stages. Other options included in the least cost development 
solution are new combined cycle units, with or without heat recovery, operated 
on imported natural gas.

Based· on the new electricity and heat demand forecasts, the least cost solutions 
about the electricity and heat generating capacities in the National Power System 
until 2010 should not qualitatively differ from the solution established by the EDF-
Tractebel-SEP "Least cost development" study.

Besides, even if security and environment aspects are not the subjects of this 
economic study, they represent also convincing points for the completion of the 
Cernavoda NPP2. Indeed. Cernavoda NPP1 is among the best ten performing nuclear 
power plants and different measures have been taken into account to improve safety 
and security for the NPP2 completion. Another important fact is that the Cernavoda 
nuclear plants rely on the CANDU system, which will enable Romania to be self 
reliant in the nuclear sector as a CANDU uses natural uranium fuel, which is 
produced locally.