Publicatie Laka-bibliotheek:
Nuclear power in the Soviet Union (1983)
| Auteur | IAEA, B.A.Semenov |
| Datum | april 1983 |
| Classificatie | 2.34.0.00/02 (RUSLAND - ALGEMEEN) |
| Voorkant |
|
Uit de publicatie:
Nuclear power Nuclear power in the Soviet Union by B.A. Semenov* Even though the Soviet Union is a large industrial state which bases its economic development on its own mineral fuel resources, it cannot afford to neglect the development of nuclear power, because about 80% of its energy resources are concentrated in eastern regions of the country, while 75% of the population and consumers of power are concentrated in the European part of the USSR. The transport of fuel from the east of the Soviet Union to western regions constitutes about 40% of the turnover of the country's rail freight. Another important factor which led the Soviet Union to favour nuclear power as a main source of energy was that nuclear power is less damaging to the environment than conventional power. By the end of 1982, the total installed capacity of nuclear power plants in the USSR exceeded 18 000 MW. In 1981 the Soviet Union's nuclear power plants generated 86 billion kWh electricity - 6.5% of the country's total electricity production. During the next five-year period the generation figure will increase more than threefold and will reach 220 billion kWh in 1985. Since it is planned that the total electric power production in the country will be increased to about 1500 billion kWh, nuclear plants will account for 14% of the total electricity production in the entire country by 1985 and for 24% in the European region. Although the capital investment costs for nuclear power plants are 1½ to 2 times higher than for plants using organic fuel, the cost figures for electricity production in the European part of the country (including the Ural$) show that nuclear power plants are quite competitive. Thus the average cost of nuclear-generated electricity in 1979 was 0.793 copeck/kWh, whereas the average cost of electricity from conventional power plants was 0.753 copeck/kWh. * Mr Semenov is Deputy Director General, Head of the Agency's Department of Nuclear Energy and Safety. This article is a personal view by Mr Semenov, and is not an expression of the official position either of the IAEA or of the USSR.
Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.