Stichting Laka

Publicatie Laka-bibliotheek:
Potential design problems for ITER fusion device (2021)

AuteurA.Hassanein, V.Sizyuk
6-07-2-23-08.pdf
Datum2021
Classificatie6.07.2.23/08 (KERNFUSIE - ITER)
OpmerkingNature Scientific Reports
Voorkant

Uit de publicatie:

Potential design problems for ITER fusion device

A. Hassanein* & V. Sizyuk

The international thermonuclear experimental reactor (ITER) is a worldwide
project currently being built in France for the demonstration of the feasibility
of thermonuclear technologies for future realization of successful commercial fusion
energy. ITER is of the tokamak based design using strong magnetic fields to confine
the very hot plasma needed to induce the fusion reaction. Tokamak devices are
currently the front leading designs. Building a successful magnetic fusion device
for energy production is of great challenge. A key obstacle to such design is the
performance during abnormal events including plasma disruptions and so-called
edge-localized modes (ELMs). In these events, a massive and sudden release of
energy occurs quickly, due to loss of full or partial plasma confinement, leading
to very high transient power loads on the reactor surface boundaries. A successful
reactor design should tolerate several of these transient events without serious
damages such as melting and vaporization of the structure. This paper highlights,
through comprehensive state-of-the-art computer simulation of the entire ITER
interior design during such transient events, e.g., ELMs occurring at normal
operation and disruptions during abnormal operation, potential serious problems
with current plasma facing components (PFCs) design. The HEIGHTS computer
package is used in these simulations. The ITER reactor design was simulated in full
and exact 3D geometry including all known relevant physical processes involved
during these transient events. The current ITER divertor design may not work
properly and may requires significant modifications or new innovative design
to prevent serious damage and to ensure successful operation.