Concept of a Decommissioning Plan for Old Nuclear Power Reactors (2008)

AuteurGuiding Principles from NGOs
Datum2008
Classificatie 6.01.2.40/19 (ONTMANTELING)
Voorkant

Uit de publicatie:

Foreword

The Concept comprises an introduction, two parts and several attachments.

The Introduction presents main approaches, which, in the authors' opinion, 
can be used in working out the decommissioning strategy for Russian nuclear 
power units.

The first part gives an analysis of the current situation in relation to the NPPs 
closure in Russia and other countries. A classification of nuclear reactors in terms 
of their safety and design peculiarities is given; stages and possible scenarios of 
decommissioning are presented.

The second part discusses the problem of radioactive waste, spent nuclear fuel 
and legal regulation of the NPP decommissioning.

The attachments describe the international experience and give legislative 
documents, which regulated the decommissioning of nuclear power units 
in Germany and Lithuania.

The video-attachment to the Concept includes 4 documentaries. They illustrate
Lithuanian and German experience on the decommissioning of power units, 
which had RBMK-1500 and VVER-440 reactors. The social, environmental 
and technological aspects of this experience are presented.