Publicatie Laka-bibliotheek:
The economics of nuclear power (full report)

AuteurGreenpeace, S.Thomas, P.Bradford, Antony Frogatt, D.Milborrow
6-01-0-10-77.pdf
Datumnovember 2007
Classificatie 6.01.0.10/77 (KOSTEN)
Voorkant

Uit de publicatie:

The economics
of nuclear
power
Research report 2007
Stephen Thomas, Peter Bradford,
Antony Froggatt and David Milborrow




 TECHNOLOGY,
                                      g r e e n p e a c e . o rg




 ECONOMICS,
 ALTERNATIVES
 & CASE STUDIES
 REPORT NOVEMBER 2007
The economics
of nuclear power report 2007
Executive summary                              Part 2: Nuclear economics                       Part 4: Renewable energy:
                                                                                               resource, economics and prospects
Rising construction costs                  3   Main determinants of nuclear power costs   25
Rising construction times                  3   Fixed costs                                25   Resource and potential: overview                  50
Falling construction demand                3   Variable costs                             28   Economic overview                                 51
Untested technology                        3   Impact of liberalisation                        Future prospects                                  51
Unfavourable market place                  4   of electricity industries                  28   Costs                                             51
Unreliable forecasts                       4   US experience                              29   Wind energy                                       52
Subsidies needed                           5   Electricity reforms elsewhere              29   Photovoltaics                                     53
Contemporary case study:                       Dealing with risks in                           Solar Thermal Electric                            53
Finland’s Olkiluoto plant                 5    competitive electricity markets            30   Hydro                                             54
The alternative                           6    Construction time                          31   Biomass                                           54