Publicatie Laka-bibliotheek:
Patterns of Non-Compliance. The NRC and the Maine Yankee Atomic Power Company (1998)
| Auteur | H.G.Brack |
| Datum | 1998 |
| Classificatie | 3.01.8.10/01 (VS - LOCATIES - NOORD-OOST ALGEMEEN) |
| Voorkant | ![]() |
Uit de publicatie:
Foreword This is the fourth in a series of reports by the Center for Biological Monitoring (CBM) on the Maine Yankee Atomic Power Company (MY APC) in Wiscasset, Maine. These reports originated from observations made by CBM during collation of routine licensee generated radiological data in the late 1970's and early 1980's. At this time, discrepancies were first noted in MY APC radiological monitoring programs, and CBM issued a report in 1986 (Brack, 1986). We later noted irregularities in waste disposal and decommissioning funding estimates, resulting in another CBM report in 1993 (Brack, 1993). In 1995, a whistleblower's letter revealed that computer codes pertaining to the capacity and safe operation of both the emergency core cooling system and the reactor vessel containment were altered in two successful attempts to upgrade the rated thermal power of the MY APC reactor. The result was the generation of an additional +/- 100 million dollars in MY APC revenues over the period of a decade. The Nuclear Regulatory Commission (NRC) responded to the whistleblower's allegations by issuing a confirmatory order limiting power operations on January 3, 1996. Additional NRC inspections and investigations resulting from this allegation opened a Pandora's box of safety and legal issues and resulted in charges by many organizations and individuals of illegal and unsafe operations and negligent NRC oversight of licensee activities. The generic deficiencies in radiological surveillance reports discussed in this report represent only one subset of these issues.
Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.

