Stichting Laka

Publicatie Laka-bibliotheek:
Assessment UK radioactive waste management strategies using Darwin 3 (1997)

AuteurM.C.Rolls, WS Atkins, Science & Technology
Datumjuni 1997
Classificatie2.05.4.10/40 (GROOT-BRITTANNIË - AFVAL)
Voorkant

Uit de publicatie:

INTRODUCTION

This report has been prepared by WS Atkins Science & Technology for the 
Department of the Environment, Transport and the Regions (DETR) under contract 
number RW 8/11140. The work was mainly undertaken before June 1997 when the 
Department of Environment (DOE) existed in its own right. The objective of the 
assessment was to analyse a number of alternative scenarios for the production and 
management of UK radioactive wastes using version 3 of the computer code 
DARWIN (DOE Assessor of Radioactive Waste INventory [I]).

The main source of information was the 1994 United Kingdom Radioactive Waste 
Inventory (1994 Inventory) [2]. The 1994 Inventory, prepared for United Kingdom 
Nirex Limited (Nirex) and the DOE, contains a detailed record of radioactive wastes 
held in stock in the UK on 1 April 1994, and those forecast to arise in the future. 
The information is provided by the producers of radioactive wastes in the UK based 
on their assessments of the nature and scale of their future operations and activities. 
All were asked to complete detailed questionnaires about the radioactive waste 
they were producing.

Waste producers at the time the 1994 Inventory was taken (April 1st 1994) were 
British Nuclear Fuels plc (BNFL), Nuclear Electric plc (NE), Scottish Nuclear Ltd 
(SNL), UKAEA, Ministry of Defence (MoD), Urenco and a number of minor 
producers.

The UK nuclear power industry was restructured on 31st March 1996. All Magnox 
reactors have been retained in the public sector operated by Magnox Electric and 
BNFL, whilst the remaining Advanced Gas cooled Reactors (AGR) and Pressurised 
Water Reactor (PWR) stations are operated by Scottish Nuclear Ltd and Nuclear 
Electric plc as subsidiary companies of British Energy plc. The 1994 Inventory does 
not take account of this restructuring and hence all references to Nuclear Electric and 
Scottish Nuclear in the inventory and in this report are to the pre-1996 companies.

Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.