nr  | titel | auteur | datum |
|---|
| 6.01.2.29/03 | Fuel and heavy water availability | INFCE | maart 1980 |
| 6.01.2.29/02 | Zirconium, Titane, Magnesium, Tantale | Gezus | 1983 |
| 6.01.2.29/01 | Zirconium | Gezus | |
| 6.01.2.30/35 | Reactortheorie | K.L.A.Weimar, RCN | februari 1965 |
| 6.01.2.30/34 | Reactor Handbook. Vol.4. Engineering | S.McLain, J.H.Martens | 1964 |
| 6.01.2.30/33 | Leidraad bij het college kernreactoren B.O. | D.G.H.Latzko | 1973 |
| 6.01.2.30/32 | Leidraad bij het college kernreactoren. Dl 2 | D.G.H.Latzko | 1973 |
| 6.01.2.30/31 | Leidraad bij het college kernreactoren. Dl 1 | D.G.H.Latzko | september 1975 |
| 6.01.2.30/30 | Nuclear reactor engineering | S.Glasstone | 1956 |
| 6.01.2.30/29 | Metallurgy in nuclear power technology | J.C.Wright | 1962 |
| 6.01.2.30/28 | Nuclear Power Stations | Margulova, Troitsky | 1978 |
| 6.01.2.30/27 | Les conséquences de la construction d'une centrale nucleaire sur l'économie régionale et l'emploi | EdF | september 1981 |
| 6.01.2.30/26 | The Physical Theory of Neutron Chain Reactors | Weinberg, Wigner | 1958 |
| 6.01.2.30/25 | Kernreactorkunde. Een beknopte inleiding | Caspers, Hoek | |
| 6.01.2.30/24 | The pressurised water reactor | NNC | |
| 6.01.2.30/23 | Nuclear power from fission reactors | US DOE | maart 1982 |
| 6.01.2.30/22 | Jaderné reaktory | CEZ | |
| 6.01.2.30/21 | A guidebook to nuclear reactors | A.V.Nero jr. | 1979 |
| 6.01.2.30/20 | De kerncentrale | VEEN | augustus 1980 |
| 6.01.2.30/19 | Nuclear Power Reactors | UKAEA | februari 1993 |
| 6.01.2.30/18 | Energie-analyse van de totale kernenergiecyclus gebaseerd op lichtwaterreactoren | J.Kistemaker | 1975 |
| 6.01.2.30/17 | General description of a Boiling Water Reactor | General Electric | september 1980 |
| 6.01.2.30/16 | The Pressurised Water Reactor | UKAEA | november 1985 |
| 6.01.2.30/15 | KWU-Kernkraftwerk Druckwasserreaktor | KWU | oktober 1986 |
| 6.01.2.30/14 | Nuclear reactor safety | Ontario Hydro | mei 1986 |
| 6.01.2.30/13 | Wie funktioniert ein Kernkraftwerk | INFEL | |
| 6.01.2.30/12 | Nuclear power plant safety: Operations | US DoE | |
| 6.01.2.30/11 | Nuclear power plant safety: Design & Planning | US DoE | |
| 6.01.2.30/10 | Capitalizing on BWR simplicity at lower power ratings | Duncan, Sawyer, Hucik | 1986 |
| 6.01.2.30/09 | Regulatory approval processes during construction of nuclear power plants | Brooks, Morisson, EACL | 1986 |