| Title: | Plans by Connecticut Yankee to build and operate |
|---|---|
| Description | kort nieuws |
| Date | 23 January 2002 |
| Page number | 2 |
| Magazine | World Nuclear Association News Briefing, London, UK |
| Year | 2 |
| No | 5 |
| Number of pages | 1 |
| Tags: | INTERIM AIRCOOLED WASTE STORAGE - dry storage HADDAM NECK, USA - US: Nuclear Power Northeast Utilities (NU) in Connecticut COSTS NUCLEAR ENERGY - Atomic energy costs UNITED STATES OF AMERICA - United States |
This article is available in Laka's library. Request a copy or a scan by mail.
« previous article