date | INES | title | location |
18-01-1994 | INES 1 | CRACK IN CONTROL ROD HOUSING | JOSE CABRERA-1 (ZORITA), Spain |
25-02-1999 | INES 0 | Core instability occurred during maintenance performed in the switchyard | OSKARSHAMN-2, Sweden |
03-03-1994 | INES 2 | COOLANT LEAK FROM THE AUXILIARY PRIMARY CIRCUIT CLEANUP SYSTEM DURING COOLDOWN OF THE PRIMARY CIRCUIT | KOLA-2, Russian Federation |
04-10-2011 | INES 2 | Contamination of workers during inspection | Belgoprocess, Belgium |
10-07-2001 | INES 2 | Contamination of workers during dismantling of alpha dry glove boxes | NUCLEAR RESEARCH INST., REZ, Czech Republic |
23-11-1992 | INES 2 | CONTAMINATION OF WORKERS DUE TO THE RUPTURE OF A MIXED OXIDE FUEL ROD DURING FABRICATION | FBFC, Belgium |
02-10-1991 | INES 2 | CONTAMINATION OF THE SECONDARY WATER DUE TO ERRORS OF THE SPECIAL WATER TREATMENT FACILITY PERSONNEL | ZAPOROZHE-2, Ukraine |
22-07-1991 | INES 1 | CONTAMINATION OF SOIL ON SITE | KOZLODUY-1, Bulgaria |
21-07-2022 | INES 2 | Contamination of an employee and the break room in a nuclear medicine department | SCINTIGARD radiology centre (Nîmes), France |
26-05-2010 | INES 2 | Contamination of 6 workers during the recovery of a gammagraphy Co-60 source | industrial radiography, France |
21-09-2017 | INES 2 | Contamination event at research facility | Studsvik Nuclear AB, Sweden |
10-06-1992 | INES 1 | CONTAMINATED PARTICLES DISCOVERED ON-SITE | KOZLODUY-1, Bulgaria |
11-03-2002 | INES 2 | Consequential failure of Fuelling Machine Interlock at Buffer Storage Tube | HEYSHAM-1 UNIT A, United Kingdom |
24-03-1995 | INES 2 | CONFIRMED DOSE ABOVE STATUTORY DOSE LIMIT PROBABLY DUE TO A WOUND | BNFL, Sellafield, United Kingdom |
26-09-2013 | INES 2 | Common cause mechanical deficiency in control rods | High Flux Reactor / Petten, Netherlands |
15-10-2001 | INES 2 | Cobalt-60 contaminated steel slabs sent to Italian shipyard from a foundry in Macedonia | SHIPYARDS, Italy |
07-10-2008 | INES 2 | Cobalt-60 contaminated elevator buttons sold abroad by a French company | Metallic products manufacturer, France |
11-01-2019 | INES 1 | Co60 source discovered in a scrap metal delivery | Port of Hamburg, Germany |
20-07-2010 | INES 2 | Co-60 orphan source discovered in a container of metal scraps in the Genova Port | Genova port, Italy |
27-09-1997 | INES 2 | Closed valves in the containment spray pumps' suction lines during the non-nuclear phase of start-up after refueling | RINGHALS-4, Sweden |
28-07-1992 | INES 2 | CLOGGED PUMP SUCTION STRAINERS IN THE WET WELL POOL | BARSEBECK-2, Sweden |
25-08-2004 | INES 2 | Circumferential break of Essential Service Water (ESW) hatch neck pipe | VANDELLOS-2, Spain |
12-01-1993 | INES 0 | CABLE CATCHING FIRE AT THE CONNECTION POINT FOR PORTABLE UTILIZING EQUIPMENT | CHERNOBYL-3, Ukraine |
22-07-1991 | INES 3 | BREACH OF UNIT LIMITING CONDITIONS FOR OPERATION WHILE PREPARING FOR RESTART AFTER MAINTENANCE DUE TO ECCS AND MSV UNAVAILABILITY | SMOLENSK-2, Russian Federation |
16-09-1991 | INES 2 | BORON MEASURING DEVICE CALIBRATION ERROR AT THE CHEMICAL LABORATORY | CHINON-B1, France |
27-08-2001 | INES 2 | Boron concentration below specification in borated water storage tanks of 3 out of 4 ECCS trains | PHILIPPSBURG-2, Germany |
30-06-2015 | INES 2 | Bordeaux University: discovery of radioactive sources and incidental exposure of persons | Bordeaux University, France |
25-10-1991 | INES 2 | BORATED WATER STORAGE TANK LEVEL REDUCTION TO 180 M3 | NOVOVORONEZH-4, Russian Federation |
03-03-1993 | INES 0 | BLOWN FUSE ON THE INVERTER CAUSED REACTOR TRIP | KRSKO, Slovenia |
09-09-2000 | INES 0 | Beloyarsk NPP Unit 3 scram due to events in the operation of the Urals power system | BELOYARSKY-3(BN-600), Russian Federation |