The transport of plutonium in the form of nitrate solution between Dounreay and Windscale- a safety assessment (1978)
| Author | Nuclear Installations Inspectorate |
| Date | December 1978 |
| Classification | 6.01.8.70/11 (TRANSPORTS - OTHER COUNTRIES - FROM & TO REPROCESSING PLANT (INCL. PU & HAVA)) |
| Front | ![]() |
From the publication:
INTRODUCTION 1 The United Kingdom Atomic Energy Authority's (UKAEA) programme in support of the development of fast reactors for commercial use in the United Kingdom includes the operation of the Prototype Fast Reactor at Dounreay. This reactor will require the routine discharge of irradiated fuel and recharge with new fuel. There is need to prove the technology of processing the irradiated fuel and to demonstrate the use of recycled plutonium in fast reactors. 2 The proposal to move plutonium in the form of nitrate solution between the processing plant at Dounreay and the fuel manufacturing plant at the British Nuclear Fuels Ltd. Works at Windsca1e is part of that programme. Movement of plutonium has been the subject of consideration and development for some time and has been under discussion with Government Departments since 1971. These discussions led to the presentation of specific proposals. As a result the Secretary of State for Energy sought advice from the Health and Safety Commission (HSC) on the overall safety of the proposal. 3 The Nuclear Installations Inspectorate (NII) of the Health and Safety Executive (HSE) on the instructions of the HSC studied the proposals and produced this report. Their study covers proposals not normally or solely in the remit of the NII for safety regulation but also for example, those which involve the Department of Trade and Transport.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.