Publication Laka-library:
General description of a Boiling Water Reactor (1980)
| Author | General Electric |
| Date | September 1980 |
| Classification | 6.01.2.30/17 (TECHNICAL - NUCLEAR POWER PLANTS) |
| Front | ![]() |
From the publication:
Section 1 Introduction BWR BACKGROUND In this era of greater ecological emphasis, dwindling fossil fuel supply, and increased electric power demand, it becomes necessary to use to the fullest extent possible all technological advances available to us. Nuclear fuel - replacing coal, oil, and gas – provides the most economical, the most reliable, and the most stabilized power source of the era. General Electric selected the boiling water reactor (BWR) as the most promising nuclear power concept because of its inherent advantages in control and design simplicity, and established an atomic power equipment business in 1955 to offer it commercially. Aside from its heat source, the BWR generation cycle is substantially similar to that found in fossil-fueled power plants. The beginning of the General Electric BWR Product Line was the Vallecitos BWR in 1957, which was located in Vallecitos, California. This 1000-psi (6900 kPa) reactor powered a 5-MWe generator and provided power to the Pacific Gas & Electric Company grid through 1963. A major extrapolation from that first test facility is the Dresden 1 plant, located near Morris, Illinois. Construction of this 180-MWe plant began in 1959, with commercial power production achieved in 1961. The value of the BWR concept has been proven by the BWR designs General Electric has evolved over the past decade. The Oyster Creek plant, located in Toms River, New Jersey, incorporated the BWR/2, the first modern light water reactor. The BWR/2 was first offered in 1963, and had an output of well over 500 MWe. Then came BWR/3, at the twin Dresden 2 and 3 units, at 800 M We. Shortly thereafter, the Browns Ferry BWR/4 units at 1100 MWe located in Decatur, Alabama, were announced, followed by the Zimmer Class BWR/5 in 19691ocated in Moscow, Ohio. And in 1972, BWR/6 with ratings up to 1390 MWe was introduced as the sixth stage in the design evolution of the BWR. In terms of product refinement, the progressive development from BWR/1 through BWR/6 has been marked by a disciplined, evolutionary, building-block approach, supported at each step by exhaustive research and testing, and underscored by adequate design margins at each stage. Today, the selection and refinement of standard modules serves as the basis for General Electric's design standardization activities. Since the Vallecitos BWR, utilities throughout the world are committed to over 87 GE-BWR's, of which 36 are currently in operation. A summary of the BWR design progress is presented in Table 1-1.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

