Publication Laka-library:
Power propaganda (1980)
| Author | Charles Komanoff |
| Date | March 1980 |
| Classification | 6.01.0.10/46 (COSTS) |
| Front | ![]() |
From the publication:
Introduction and Summary In May 1979, the Atomic Industrial Forum, the trade association of nuclear manufacturers, constructors and utilities, published its annual survey of electricity generating costs at U.S. power plants. The survey concluded that nuclear plants had an average generating cost of 1.5¢ per kilowatt-hour in 1978, while coal-fired plants had an average cost of 2.3¢/kWh. In its accompanying press release, the AIF stated that 43 out of the 48 U.S. utilities owning or operating nuclear plants were represented in the survey. Thus, the survey appeared to be a fairly comprehensive account of the relative economic performance of nuclear and coal-fired plants. For this reason, and because no competing figures were available, the AIF figures have been accepted as authoritative, and have been widely cited as evidence that nuclear power is currently a significantly less expensive source of electricity than coal. They have been reported in the New York Times, the Wall Street Journal, Time, and Science, among other publications. The figures continue to be quoted by the AIF and the Edison Electric Institute, and in many utility industry advertisements and other literature advocating increased use of nuclear power. The AIF data do not provide a fair comparison of the current costs of nuclear and coal power. As we show below, they drew upon fewer than two-thirds of U .S. commercial power reactors, not nine-tenths as implied by the AIF. Moreover, the AIF omitted the plants with the highest construction costs and the worst performance. The 21 omitted reactors cost an average of 60 percent more to construct, and produced 19 percent less electricity per unit of capacity, than the 39 reactors included in the AIF sample. As a result, the average generating cost of the omitted reactors was 70 percent greater than that of the survey reactors.This remarkable instance of bias is not the only defect in the AIF survey. The survey also: • failed to make sufficient allowance for nuclear waste and decommissioning costs; • excluded lower-cost coal plants operated by the country's two largest coal-burning utilities (American Electric Power and the Tennessee Valley Authority) because their nuclear plants were not included; and • penalized other coal-fired plants for being used below their potential capacity due to excess generating reserves.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

